Award of ENV0443 N75 Lady Octavia to Sinclair Street Cycle Route
key details
| Value | £58,930 |
|---|---|
| Category (CPV) | 45000000 +2 more |
| OCID | ocds-r6ebe6-0000648178 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Newlay Civil Engineering Ltd | £58,930 | · | · |
description
Site ClearanceAll overgrown vegetation over the entire length is to be cut back to expose the edging of the existing cycle path network. The existing cobbled edging is to be removed. The vegetation is to be cut back a minimum of 1m from the existing edging to help with path extension. All cleared material is to be disposed of off-site.EarthworksThe existing path surfacing will be fully excavated and disposed of off-site. The Contractor shall identify if the make-up beneath the existing surfacing is suitable for re-use and obtain the Project Managers approval to re-use. Areas of unsuitable make-up shall be excavated and removed in accordance with the Contract drawings. widened to 3m.The two sets of steps are to be fully removed and disposed of off-site in accordance with the Contract drawings. The paths will be re-graded as per the Contract drawings.DrainageThere is a requirement to install drainage to cope with the surface water run-off from the embankment at the locations shown on the Contract drawings. They mainly consist of installing a dished channel at both location and a gully with grating and frame at one location with the outlet to connect into an existing manhole.Footways and Paved AreasThe path will be centrally widened i.e. from the centre of the existing path – 1.5m either side. Precast flat top concrete edging will be installed to form the path edges with the path forming a camber to shed surface water either side. The path will have type 1 placed and compacted before laying single layer of asphalt to specified depth and camber.All levels and tie ins will be the responsibility of the Contractor to confirm and seek the Projects Managers approval.Traffic Signs and Road MarkingsOver the extents of the site there will be permanent bollards and cycle markings to be installed as per the Contract drawings.
more from Inverclyde Council
- Purchase of a JCB Wheeled Material Handler with Grab · 9 Sept 2026
- Secure Access Control Solution · £97,060 · 12 Aug 2026
- Provision of a Therapeutic Horticulture and Employability Service · £533,600 · 28 Jul 2026
- Provision of Supported Living Placements at Todhill Housing Support Service · £686,000 · 28 Jul 2026
- Award of Utilities Spend Recovery Review · £30,000 · 23 Jul 2026
- GMB Windows Replacement (Phase 7 - Wallace Place) · 14 Jul 2026
- Alcohol and Drugs Recovery Contract · £1,200,000 · 17 Jun 2026
- Highholm Park and Ride Extension · 12 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- 12694 - Stalybridge Multi Storey Car Park · Tameside Metropolitan Borough Council · £5,000,000
- 20266 - Proposed Single Storey Rear Bedroom and Shower Room Extension at 29 Elworthy Avenue, Halewood L26 7AA · Knowsley Council · £80,000
- Derby City Council - Bute Walk · WESTWORKS PROCUREMENT LIMITED · £1,081,059
- 20264 - Proposed Single Storey Rear WC Extension at 28 Mirfield Close Halewood L26 9XP · Knowsley Council · £50,000
- 20261 - Proposed Single Storey Rear Bedroom Extension at 6 Fleetwood Gardens, Kirkby, L33 1TP · Knowsley Council · £50,000
- 12692 - Proposed Single Storey Rear / Side Bedroom and Shower Room Extension at 35 Elizabeth Road, L10 4XJ · Knowsley Council · £80,000
- 12691 - Proposed Single Storey Side / Rear Bedroom and Shower Room Extension at 103 Bearwood Road, L33 2AF · Knowsley Council · £80,000
- SCC - KC - St. Martins CoE Demountable Classrooms · SURREY COUNTY COUNCIL · ·
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.