Sumburgh Airport Baggage Handling System
key details
| Status | complete |
|---|---|
| Category (CPV) | 34961000 |
| Region | Scotland |
| Deadline | 10 Sept 2019 |
| Procedure | open |
| OCID | ocds-r6ebe6-0000592472 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | · | · | · |
description
HIAL intend to appoint a sole contractor for the supply, delivery and integration of the new baggage handling system at Sumburgh Airport as well as ongoing maintenance and support services.
documents
- Proposed BHS Layout
- Proposed Plan Using Logplan Drawing (2)
- Proposed Ceiling Plan
- Proposed Ground Floor Fire Strategy
- Proposed Sections A & B
- Proposed Sections C & D
- Proposed Contractors Compound
- Mechanical Services Ventilation & Air Conditioning Downtakings
- Mechanical Services Heating Downtakings
- Mechanical Services Proposed
- Electrical Services Proposed Works
- Design Hazard Elimination Risk Reduction Register
- Pre Construction Health and Safety Information
- Site Information
- BHS Works Information
- BHS Performance Specification
- BHS Performance Specification Supporting Information
- Phased Demolition Works Phase 1A
- Phased Construction Works Phase 1B
- Phased Demolition Works Phase 1C
- Phased Construction Works Phase 1D1
- Phased Contruction Works Phase 1D2
- Existing Ground Floor Plan
- Phased Demolition Works Phase 1D3
- Phased Construction Works Phase 1D4
- Phased Contruction Works Phase 1E
- Phased Construction Works Phase 2
- Phased Construction Works Phase 3
- Completion
- Indicative Phasing Report
- Appendix B - LSI Pricing Schedule
- Appendix G - LSI BI Contractor Activity Schedule
- Appendix D - LSI BHS - Draft Contract
- Existing Ceiling Plan
- Appendix A - Tender Response Form
- ITT Tender Document
- Appendix B - Pricing Schedule
- Appendix G - Activity Schedule
- CAD - HIAL-SUM-TB-1 Rev S Ground Floor Plan
- CAD - HIAL-SUM-TB-2 Rev S First Floor Plan
- CAD - HIAL-SUM-TB-3 Rev S Second Floor Plan
- CAD - HIAL-SUM-TB-4 Rev S Roof Level Plan
- LSI-DWG-A-00000027 rev 01
- LSI Tender Programme
- Existing Ground Floor Fire Strategy
- Slides from site visit
- Existing Section A & B
- Existing SEction C & D
- Existing Ground Floor Downtakings
- Proposed Plan Using Logplan Drawing
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
more from Highlands and Islands Airports Limited
- Provision of Airfield De-Icer (Fluid and Granules) at Ten Airports · 23 Jul 2026
- Provision of Interim Professional Services · £250,000 · 22 Jul 2026
- Civils Maintenance Provision · 13 Jul 2026
- HIA-26-012 Voice Communication and Control System (VCCs) · £540 · 6 May 2026
- HIA-25-001 HR & Payroll System · £341,997 · 23 Apr 2026
- Design and Build of Lattice Towers at Sumburgh, Kirkwall, Dundee and Campbeltown Airports · £300,000 · 21 Jan 2026
- Air Traffic Service Maintenance Service · £3,700,000 · 19 Jan 2026
- Provision of Hold Baggage X-ray Equipment at Six Airports · 31 Dec 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Inverness Baggage Integrator · Highlands and Islands Airports Limited
- Integration of Standard 3 Hold Baggage X-ray Screening Equipment at Jersey Airport, Channel Islands · Ports of Jersey
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.