Barbican Renewal Programme - Glass Systems and Envelope
key details
| Value | £10,600,000 (£12,720,000 inc. VAT) |
|---|---|
| Status | planned |
| Category (CPV) | 45300000 +2 more |
| Region | London |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-06fa74 |
description
This is a bespoke glazed envelope design-and-build package, not new-build construction, on a part Grade II listed and Heritage sensitive building – The Barbican Arts Centre. The works comprise new glazed envelope and façade systems to the Conservatory and Stair 8, following directly behind the demolition (by others), which removes the existing glazing first. The package includes primary steel structure to the Conservatory and Terrace, and the façade access/maintenance walkway and associated gutters and louvres. The scope of works includes:
| - | Conservatory roof and vertical glazing: louvres, vents, perimeter benches, insulation, aluminium panelling, doors and associated gutters, including the Arid House. |
| - | Steel structure relating to Conservatory glazing: primary steel structure supporting the Conservatory roof and vertical glazing systems, carried within this package's own Contractor Design Portion. |
| - | Conservatory Lantern: re-glazed roof lantern. |
| - | Conservatory Rooflights: Level 02 office rooflights and associated overhead glazing. |
| - | Garden Room glazing, doors and associated gutters: refurbished steel framing to Lakeside Terrace with new acoustic double glazing/doorsets, overhead and Conservatory-facing glazing, and plant-room gutter louvre/infill system. |
| - | Conservatory Terrace Glazing and Steel: new Level 04 enclosure — bespoke steel T-profile vertical glazing, matching overhead glazing, and the Terrace's primary steel structure and roof steelwork. |
| - | Sculpture Court Rooflights: new rooflights, scope to be developed with the Architect and Façade Engineer. |
| - | Stair 8 glazing and associated structure, louvres and gutters: crown/roof glazing on new external primary steel RHS mullions, planters glazing renewal, automated opening windows, exoskeleton mullion replacement (this package's own CDP), and crown mechanical louvres. |
| - | Visual and performance mock-ups: façade and propagation bench, Conservatory Terrace and Flytower infill glazing visual mock-ups, plus off-site performance mock-ups covering roof and façade weather-resistance to CWCT Sequence A methodology. |
| - | Facade access and associated maintenance walkway: including the Conservatory Terrace mesh walkway and fascia panel. |
more from The Mayor and Commonalty and Citizens of the City of London
- Golden Lane Estate Structural Engineers Stage 3 Assessment Phases 1, 2A, 2C & 2D · £34,000 · 15 Sept 2026
- Consultancy and technical support to enable SITS-safe migration from PayPal to Flywire · · · 11 Sept 2026
- Real Estate Valuation & Development Software Solution · 10 Sept 2026
- Billingsgate Market roof repairs · £52,786 · 10 Sept 2026
- Epping Forest Major Habitat Restoration Works Lot 2 (2026 - FM2-3) at Barn Hoppitt, Highams Park, Leyton Flats ("CSS FM2" works for agreement 1628782) - complete as per contract documentation · · · 8 Sept 2026
- Events Management Consultancy · £37,500 · 7 Sept 2026
- Pupil Assessments · · · 4 Sept 2026
- City of London - HRA - Maintenance of Lifts and Platform Lifts · £600,000 · 2 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PAN3466- Supply and Installation of Mobility Scooter Stores · Leicester City Council · £304,331
- Lewes District and Eastbourne Borough Councils - Social Decarbonisation Retrofit Contract · PROSPER · £2,500,000
- Believe - SHF Wave 3 Works · PROSPER · £1,700,000
- Estates Refurbishment (CLS) · Police And Crime Commissioner For Durham · £210,959
- Communal Heating Boiler Replacement Works - Arkwright House, Huntingdon Gardens and Chelmsford Court · Platform Housing Group · £1,000,000
- 12 Kirby Road; Phase 2 - Internal conversion and fit-out of guesthouse to two 4-bedroom maisonettes. £15k - £400k BHC Building and Refurbishment Framework · Blackpool Council · £217,507
- Lincoln College Loft Insulation - Abbey Building, Friary Building and Temple Building · Lincoln College Group
- Refurbishment Works Lot 3 Blandford Fire Station · Dorset & Wiltshire Fire and Rescue Authority · £878,102
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.