09TS Victoria Line Supply of Gearbox Assembly
key details
| Value | £435,761 (£522,913 inc. VAT) |
|---|---|
| Status | complete |
| Region | London |
| Procedure | direct |
| OCID | ocds-h6vhtk-06f52a |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| VOITH TURBO LIMITED | £435,761 | · | pending |
description
This is a goods only requirement estimated to be circa £435k for the supply of Gearbox Assemblies to support the 09TS Victoria Line Fleet Heavy Overhaul Program Lift (HOPL) project. They use a system of gears to adjust the power and speed between the trains electric motors and its wheels. They allow the train to change gears to multiply torque for a strong start from a standstill or to maintain a high speed efficiently on a straight track.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Sept 2026 | Transparency notice (UK5) | Procurement Act 2023 | 085180-2026 |
more from London Underground Limited
- Supply of Negative Bearings for Circle, District & Hammersmith and City Lines · 6 Jul 2026
- Elizabeth line software requirements - Workforce Rostering · £2,000,000 · 26 Jun 2026
- 1972 Bakerloo line Tube stock Supply of Electrical Harnesses for Rail Vehicle Accessibility Regulations Project · £800,000 · 12 Jun 2026
- Overhaul of Jumpers for S Stock Metropolitan Line Fleet · £1,000,000 · 4 Jun 2026
- 1972 Bakerloo line Tube stock Supply of Electrical Parts for Rail Vehicle Accessibility Regulations Project · £458,340 · 4 Jun 2026
- Inspection, refurbishment, and re-panning of wheel pans used on London Underground Circle, District and Hammersmith and City and Metropolitan line fleets. · 27 May 2026
- Bridges and Civil Structures Maintenance Contract · £73,355,855 · 24 Apr 2026
- Primary Spring Chevrons - 09 HOPL (Victoria Line) · 23 Apr 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.