Appointment of a Contractor for the flushing/treatment of heating systems
key details
| Value | £99,921 (£119,905 inc. VAT) |
|---|---|
| Status | complete |
| Procedure | limited |
| OCID | ocds-h6vhtk-06d4d0 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Intoheat Ltd | · | · | active |
description
The Royal United Hospitals NHS Foundation Trust has identified an urgent requirement for the flushing/treatment of heating systems as part of its wider Decarbonisation Project. The Trust is seeking to improve the operational efficiency, reliability and longevity of several Low Temperature Hot Water (LTHW) heating systems across the estate through the implementation of a comprehensive water treatment and side-stream filtration solution.
Docusign Envelope ID: 17C14E0A-B843-84EA-8335-50B8813EFC76
The existing heating systems require ongoing protection from the adverse effects of corrosion, scale formation, suspended solids, magnetite accumulation and air ingress, all of which can reduce system efficiency, increase energy consumption and contribute to premature plant failure. As part of the Trust's decarbonisation objectives, maintaining optimal water quality within these systems is essential to support efficient heat generation and distribution, reduce energy losses and minimise maintenance requirements.
The proposed solution comprises the installation and commissioning of ENWA EnwaMatic® side-stream filtration and water treatment units across six separate LTHW systems serving the Wolfson, MRI, South, X-Ray, Z-Level and Central plant areas. The equipment provides continuous side-stream filtration to below 10 microns, pH control, corrosion inhibition, scale control, air removal and reduction of bacterial growth potential within the heating systems. The solution is designed as an alternative to conventional chemical dosing regimes and is intended to provide long-term maintenance of water quality and system performance.
The requirement includes the supply of filtration units, automated backwash controls with Building Management System (BMS) integration, dedicated circulation pumps, break tanks, delivery and manufacturer-led commissioning. Manufacturer commissioning is required to validate equipment warranties and ensure the systems are operating in accordance with the intended design parameters.
Delivery and installation of the water treatment solutions will support the Trust's objectives of improving heating system efficiency, reducing lifecycle maintenance costs, protecting critical infrastructure and contributing towards the Trust's sustainability and carbon reduction targets.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 28 Jul 2026 | Contract details (UK7) | Procurement Act 2023 | 071041-2026 |
more from Royal United Hospitals Bath NHS Foundation Trust
- National Clinical Audit and Patient Outcomes Programme (NCAPOP)- RUH (26/27) · £10,000 · 30 Jul 2026
- Evaluation of BMM Programme (HIWE) · £49,720 · 30 Jul 2026
- Supply of GI manometry System with maintenance. · £113,484 · 24 Jul 2026
- Replacement of Lift 19 · £175,000 · 22 Jul 2026
- RUH ED Corridor Screeding Works · 20 Jul 2026
- Service WEQAS Blood Gas Scheme · 17 Jul 2026
- Lease of Coffee Machine · 17 Jul 2026
- Zoho CRM Licences · 15 Jul 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.