gvtcx

Design and Construction of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site

Cyson Cymru Published 21 Jul 2026 Find a Tender Open until 17 Aug 2026

key details

Value£2,700,000 (£3,240,000 inc. VAT)
Statusactive
Category (CPV) 45000000 +3 more
RegionWales
Deadline17 Aug 2026
Procedureopen
OCIDocds-h6vhtk-06cfc2

description

Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation.

It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7.

The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857.

ITT Reference: ITT_126083

Please note that a pre market engagement notice was previously published in relation to this tender. MAR594663

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 Jul 2026 Tender notice (UK4) Procurement Act 2023 068661-2026

more from Cyson Cymru

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.