Market Engagement Questionnaire for T1418 How can batteries make the DC network safer and more cost effective?
key details
| Value | £180,000 (£216,000 inc. VAT) |
|---|---|
| Status | planning |
| Category (CPV) | 73110000 |
| OCID | ocds-h6vhtk-06b002 |
description
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’. The 3rd rail system is predominantly used in the south of England but is also used by the Merseyside commuter rail network in the North-West. Because of its accessible position on the ground next to the running rails, 3rd rail systems pose an electrical safety risk to the public and railway staff.
To address these concerns in a cost-effective way, small retrofittable batteries could be used to allow trains to run between modest gaps in 3rd rail. This would allow removal of live 3rd rail at higher risk location such as stations, level crossing, and junctions. Elimination of certain sections of the DC network, such as at switch and crossing junctions, could also result in maintenance productivity gains. RSSB project T1272 ‘Compatibility and optimisation considerations for rolling stock traction batteries and battery charging’ (T1272 Phase 1b Report FINAL – Page 64) indicated that a modest sized battery of 100 kWh could potentially remove larger parts of the DC network and allow a train to move through up to two kilometres of traction power disruptions.
The introduction of batteries for these aims must consider capital and operational costs, the engineering and operational controls that would be needed, and the transition strategy for both rolling stock and infrastructure.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Research-services./F3ZBDSMB6C
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/F3ZBDSMB6C
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Jun 2026 | Preliminary market engagement (UK2) | Procurement Act 2023 | 053890-2026 |
more from Rail Safety Standards Board (RSSB)
- 1054260192 T1420 and T1421 Preliminary Market Engagement Briefing – Freight Vehicle Braking Research · £0 · 29 Jul 2026
- 1053603399 T1402 Future management of PFAS for the GB rail industry · £120,000 · 28 Jul 2026
- RISQS · 17 Jul 2026
- 1049366347 T1418 Opportunities for battery-powered trains to improve the safety and efficiency of the 3rd rail DC network · £180,000 · 9 Jul 2026
- 1047912512 2026-SUS-001 Consultancy Support for a Rail Industry Social Impact Report · £35,000 · 2 Jul 2026
- Equality, Diversity and Inclusion Accreditation · 22 Jun 2026
- Brand strategy and marketing support · 1 Jun 2026
- Safety Risk Model (SRM) v10 upgrade · 1 May 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of DLEARN-Doran Review Research · Scottish Government · £120,000
- RSGR0002 Rail Evaluation Call-Off Contract · DfTc - Department for Transport · £3,000,000
- Award of Liability for council tax debt: A review of the evidence for victim-survivors of domesti... · Scottish Government · £18,798
- MoJ and ALB Media Monitoring Service retender 2026 · Ministry of Justice · £198,524
- Provision of Evaluation Research Support - Lot 2 · DfTc - Department for Transport · £1,250,000
- Provision of Evaluation Research Support - Lot 1 · DfTc - Department for Transport · £1,250,000
- Independent Evaluation of the MoJ Legal Support Grant 2026-2029 · Ministry of Justice · £929,670
- Evaluation of Impacts on the Conservation features of protected sites within the North Chilterns · Natural England · £24,740
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.