Subsea Cable Remediation and Protection
key details
| Status | active |
|---|---|
| Category (CPV) | 45244000 +2 more |
| Procedure | selective |
| OCID | ocds-h6vhtk-06aff0 |
description
National Grid is seeking to establish a long-term framework agreement with an experienced Contractor capable of delivering cable protection solutions, including rock berms, rock bags, concrete mattresses, and other manners of appropriate protection of subsea electricity cables.
This tender is issued by National Grid UK "NGUK" Limited for and on behalf of its entities. The contract allows the wider National Grid Group and its JV Partners ("Employer") to instruct Work.
NGUK and its subsidiaries shall instruct the Contractor to provide the Works for the following Interconnector Assets and Projects and any subsequent Assets which are commissioned from time to time:
| • | National Grid Ventures Unincorporated Joint Ventures (NGV UJV) - IFA, IFA2, North Sea Link and Viking Link. |
| • | National Grid Ventures Incorporated Joint Ventures (NGV IJV) - Britned, Nemo Link, Lion Link. |
| • | Other National Grid cable businesses / Strategic Infrastructure (SI) - Eastern Green Link 1, Eastern Green Link 2, Eastern Green Link 3, Eastern Green Link 4, Eastern Green Link 5, Sea Link, Western Link, Western Link 2. |
The NGV UJV businesses will likely be the first contract users as there are currently multiple known exposures requiring protection.
The agreement will be used when a maintenance survey identifies cable exposure requiring intervention or when a new cable section recently installed requires protection after a repair.
The works shall provide minimum cover subsea cable system remediation and protection, with all the necessary and appropriate equipment required to achieve compliant completion of the works. This equipment deployed will need to cover all subsea cables and all scenarios listed below:
- a)Nearshore - In the nearshore environment, defined as water depths of 0 to 20 metres Lowest Astronomical Tide (LAT).
- b)Offshore - In the offshore environment, defined as water depths in excess of of 20 metres LAT.
In addition to the primary cable protection works, the Employer wishes to retain the flexibility to issue Work Orders for activities that may arise over the duration of this long-term agreement to support asset resilience.
While there are currently no defined scopes for these activities, the Contractor is expected to have the capability to undertake such works if required, including:
| • | Seabed debris removal and relocation - which may involve methods such as ROV grapnel tooling, ploughs or other appropriate clearance techniques. |
| • | Remedial and reburial works - including cable reburial and sand wave removal activities using methods such as Mass Flow Excavation or other appropriate excavation techniques. |
The Contractor is expected to support the core cable protection scope while maintaining the capability and readiness to deliver additional seabed intervention and cable reburial services as and when required throughout the term of the agreement.
documents
- https://www.find-tender.service.gov.uk/Notice/083788-2026 , tenderNotice
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-21927 , biddingDocuments
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Jun 2026 | Planned procurement (UK3) | Procurement Act 2023 | 053858-2026 |
| 4 Sept 2026 | Tender notice (UK4) | Procurement Act 2023 | 083788-2026 |
more from NATIONAL GRID UK LIMITED
- Framework for Traffic Management for NGED and NGET · £8,400,000 · 11 Sept 2026
- Enterprise Geospatial Licensed Maps & Data · · · 27 Aug 2026
- Excavation, Cable Laying and Reinstatement for Isles of Scilly · 21 Aug 2026
- Provision of Plant Hire Services · 31 Jul 2026
- Strategy Consulting Services · £400,000,000 · 27 Jul 2026
- Pole Planting Framework · £216,000,000 · 23 Jul 2026
- EV Charging Infrastructure · 20 Jul 2026
- Pensions Actuarial Advisory Services Framework · £5,200,000 · 13 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- SE - AOMR - Elmer Navigation Beacon Works · Environment Agency · £149,000
- New pontoons and brow at Denton · Port of London Authority
- Tender for a Construction Team to Design and Build a Marine Stop Wall and Associated Works in Canning Dock (Liverpool Waterfront) for National Museums Liverpool - AWARD · National Museums Liverpool · £2,750,000
- New South Pier Repair Works · Sunderland City Council · £688,820
- Fountain Lake Jetty TSP CAN · Ministry of Defence · £2,370,734
- Colemans Floating Pontoon Project - AWARD · East Suffolk Council
- Hendon Foreshore Barrier Works · Sunderland City Council · £1,279,320
- Lochmaddy Pier Improvement Programme Main Works · Comhairle nan Eilean Siar · £15,301,496
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.