gvtcx

prj_6641 - GBE-N Engineering Partner

Great British Energy - Nuclear Published 22 May 2026 Find a Tender

key details

Statusplanned
Category (CPV) 71000000 +2 more
OCIDocds-h6vhtk-06a164

description

This work package encompasses the engineering capability to progress the concept design produced by the Foundation Engineer (FENG) at the end of RIBA Stage 2 and to continue the development of the design for site works through RIBA Stages 3 (Spatial Planning) and 4 (Technical Design) throughout the entire lifecycle of the Small Modular Reactor (SMR) project through to and inclusive of RIBA Stage 7 (Use). The Engineering Partner will also be required to undertake works associated with any additional RIBA Stages (from RIBA Stage 0 through to RIBA Stage 7) for any emerging scope that arises over the lifecycle of the SMR Project and will be required to support with the ongoing management of design change/control.

The Engineering Partner contract is estimated to be valued between £200m - £400m

*The positions and timelines presented are based on current information and assumptions. As programme maturity develops and further validation is undertaken, scope, dates, values and sequencing may change.*

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
22 May 2026 Pipeline notice (UK1) Procurement Act 2023 047947-2026

more from Great British Energy - Nuclear

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.