Westbourne SuDs retrofit scheme installation
key details
| Status | complete |
|---|---|
| Region | Wales |
| Procedure | direct |
| OCID | ocds-h6vhtk-06838f |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Swansea Council | · | · | active |
description
contract is for the delivery of additional elements of the Westbourne Sustainable Urban Drainage (SuDS) Retrofit Parklet Scheme, in accordance with the detailed RIBA Stage 4 designs produced by Robert Bray Associates and agreed by the project steering group. The works include site preparation, drainage installation, earthworks, kerb and footway adjustments, and installation of landscape and ecological features within the adopted public highway.
A Single Tender Action is justified because Swansea Council is the statutory Highway Authority and is therefore the only organisation legally able to undertake or supervise works within the adopted highway at Westbourne.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 15 Apr 2026 | Contract details (UK7) | Procurement Act 2023 | 034438-2026 |
more from Natural Resources Wales
- AV Methane Survey · £61,301 · 7 Sept 2026
- Short Term Vehicle Hire · £500,000 · 26 Aug 2026
- Bleddfa Deer Larder – National Grid upgrade · £116,429 · 25 Aug 2026
- HVAC replacement at Swansea University Labs · £561,000 · 19 Aug 2026
- Distribution Network Operator (DNO) grid connection · £500,000 · 19 Aug 2026
- Call off - Peatlands Restoration Framework 2026-2034 - Lot 2 · £34,693 · 4 Aug 2026
- Call-off Contract from NRW61768 - Orthorectification Framework 2026-2030 · £27,000 · 28 Jul 2026
- Call off - Peatlands Restoration Framework 2026-2034 - Lot 2 · £43,450 · 28 Jul 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.