Windsor Girls School Boiler Replacement

WINDSOR LEARNING PARTNERSHIP Published 13 Apr 2026 Find a Tender

key details

Statusactive
Category (CPV) 45000000
RegionNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West
Deadline11 May 2026
Procedureopen
SME suitableYes
OCIDocds-h6vhtk-068118

description

Small Plant Room:

  • Provision of all RAMS prior to commencement of work
  • Heras fencing to secure area of works during project, including warning signs
  • Removal and disposal of all associated waste during project
  • Isolation of current gas, water and electrical supplies to facilitate works
  • Removal and disposal of existing boilers
  • Supply and fit 4 x Vaillant Ecotec VU GB 120kw modular boilers
  • Boilers to be installed in 1 x banks of 4 on manufacturer supplied frames
  • Supply and install 1 x 480kw insulated plate to plate heat exchangers connected to existing system
  • Supply and install new gas fired water heater and flue systems
  • Supply and install pressurisation unit to new boiler system
  • Alterations to existing BMS system to accept new boilers
  • Alterations to existing electrical supplies to facilitate new install
  • Provision of scaffolding for installation of new flue system and connection to boilers *Weather compensation to new boilers
  • Existing pumps to be retained
  • Alteration to all existing primary pipework to facilitate installation of new boilers *Installation of phenolic foil faced lagging to all pipework
  • Manufacturer commissioning to new boilers
  • Water treatment to existing heating pipework
  • Provision of M&E file upon completion
  • Provision of all relevant certification
  • Provision of contingency amount for asbestos survey and removal if required.

Sports Hall Plant Room:

  • Provide relevant RAMS prior to commencement of work
  • Apply cordex floor protection to area of work
  • isolate gas, water and electrical supplies
  • Remove and dispose of existing combined hot water and boiler unit
  • Supply and install 2 x new Vaillant ecoTEC 65kw condensing boiler
  • Alter pipework to boiler room as required
  • install new 300 litre unvented hot water cylinder
  • Install back up immersion supplies
  • Carry out chemical cleans of system
  • Install 35mm magnaclean magnetic sludge filter
  • Run new correctly sized gas supply externally from gas meter to new boilers
  • Run new condensate pipework to new boilers

*refill and inhibit system

  • Balance heating
  • Provide gas safety certificate

*Provide Compliance certificate

  • Provide manufacturers warranty 5 years
  • Make good to external brickwork
  • Clearance of all waste

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
13 Apr 2026 Tender notice (UK4) Procurement Act 2023 033314-2026

more from WINDSOR LEARNING PARTNERSHIP

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.