gvtcx

ROOT to Market Dynamic Market for Regenerative Procurement

HEART ACADEMIES TRUST Published 12 Mar 2026 Find a Tender Open until 31 Mar 2036
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Statusactive
Category (CPV) 09000000 +23 more
Deadline31 Mar 2036
Procedureopen
SME suitableYes
OCIDocds-h6vhtk-06680d

description

Regeneration Over Extraction. Suppliers must seek to:

Prioritise materials and products that restore, replenish, or enhance natural living systems.
Avoid extractive materials that degrade ecosystems, deplete finite resources, or cause long term environmental harm.
Use resource efficiently and maximise material lifespans through good design and appropriate material use
Demonstrate a clear transition plan away from extractive inputs where alternatives are not yet available.
Minimise embodied carbon in construction materials (e.g., concrete, steel, insulation).
Prioritise regenerative or circular construction materials (e.g., reclaimed steel, recycled aggregates, lower embodied carbon concrete alternatives, timber from regenerative forestry).
Avoid extractive materials linked to high impact mining (e.g., virgin aggregates, aluminium, PVC).
Seek to design for deconstruction, enhancing the residual value of materials at the end of design life and reducing future reliance on extractive practices

Ethical and Non-Exploitative Supply Chains. Suppliers must seek to:

Ensure all labour practices across their supply chain are fair, safe, and free from exploitation.
Avoid sourcing from suppliers or regions associated with forced labour, unsafe working conditions, or unfair pay.
Maintain transparent supply chain mapping and provide evidence of due diligence on request.
Ensure fair and safe working conditions on construction sites.
2.3Climate Friendly Operations. Suppliers must seek to:
Minimise carbon, water and waste in their organisations and core operations.
Specifically minimise greenhouse gas emissions across production, transport, and distribution.
Prioritise low carbon materials, renewable energy, and efficient logistics.
Minimise whole life carbon impacts in design and materials, optimising embodied carbon together with operational efficiency.
Reduce site emissions (plant, generators, transport) and use electric or low emission plant and machinery.
Implement site level water management and waste segregation plans.
Demonstrate continuous improvement in reducing their carbon footprint, water usage and waste production, supported by measurable data where possible.
Drive design towards deconstruction practices and offer (and advocate for) regenerative material options to replace more mainstream materials

Nature Enhancing Practices. Suppliers must seek to:

Adopt practices that actively improve soil health, biodiversity, water quality, and ecosystem resilience.
Use regenerative agricultural, manufacturing, or operational methods wherever feasible.
Avoid chemicals, processes, or materials known to harm biodiversity or natural habitats.
Implement nature positive site practices.
Ensure soil protection and restoration before and after works.
Avoid habitat disturbance and protect ecological features during construction.

Circularity and Resource Stewardship. Suppliers must seek to:

Maximise recycled, reclaimed, or up-cycled materials.
Design products and packaging for reuse, repair, or recycling.
Minimise waste generation and avoid single use materials unless essential for safety or compliance.
Design for reuse, modularity and disassembly.
Maximise reuse of demolition materials.
Avoid single use construction materials (e.g. plastic sheeting)
Offer and opt for the use of bio-based and recovered materials wherever viably possible

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 Mar 2026 Dynamic market intention (UK13) Procurement Act 2023 022187-2026

more from HEART ACADEMIES TRUST

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.