gvtcx

Operator Console

NATIONAL ENERGY SYSTEM OPERATOR LIMITED Published 24 Feb 2026 Find a Tender

key details

Statuscomplete
Category (CPV) 72000000
Procedurelimited
OCIDocds-h6vhtk-065afa

Award

SupplierValueDateStatus
PROAV LIMITED · · active

description

Design, Implementation and Support of the

Operator Console solution as per the below:

  • Provision of a detailed solution design including the following components:
  • Operator Console desktop
  • 'Single pane of glass' display across monitors plus a

touchscreen & stylus-enabled display sitting at the tabletop level

  • Seamless interaction and interoperability across a wide range of applications and networks within the 'single pane of glass' concept
  • No physical KVM or manual display-switching; the solution must be compatible with a single keyboard/mouse
  • Configurable role-based and user-based personalization of display layouts
  • Retention of existing physical telephony with capability to migrate to soft client, with the necessary headset connection at each console
  • Network connectivity as required within console, between consoles and from consoles to comms-room sources.
  • Design patterns to support extensibility of the solution onto additional desks or to additional control rooms at a future date
  • Implementation of Operator Console solution:
  • Deployment of desktop infrastructure (e.g. keyboard, mouse, displays, controllers, networking) onto existing ENCC physical desktops.
  • Deployment of end-user compute and associated hardware. This may be deployed under the control room desks or racked in a comms room environment, and we would like to explore both options as part of this RFP.
  • Deployment of highly-resilient connectivity between consoles and compute infrastructure (utilising existing networking suppliers).

Strictly Confidential

4

  • Implementation of the console across 3 sites: Control Room 1, Control Room 2 and the Control Training Unit. Please note that Control Room 1 and the Control Training Unit are at the same physical site, but different building areas, and Control Room 2 is at a separate physical site.
  • Early Life Support (ELS) period during the first 12 weeks following the project golive OR until agreed exit criteria are satisfied
  • Support of Operator Console solution
  • Provision of second-line support, on an 8-year time horizon as per the Agreement stated below.
  • 24-hour operational support including on-site response where required

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Feb 2026 Contract award notice (F03) Earlier regulations 016455-2026

more from NATIONAL ENERGY SYSTEM OPERATOR LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.