Highway Infrastructure Maintenance
key details
| Value | £12,000,000 (£14,400,000 inc. VAT) |
|---|---|
| Status | complete |
| Category (CPV) | 50230000 |
| Region | West Midlands |
| Deadline | 13 Mar 2026 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-060374 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| BUS SHELTERS LTD. | £14,557,305 | 21 Apr 2026 | active |
description
This contract is for the provision of highway infrastructure maintenance across TfWM's asset portfolio (bus shelters, totems, cycle and mobility hubs and all park and ride sites), including proactive and reactive maintenance tasks. This contract also includes the maintenance and updating of bus flags, which will be updated during network stability periods (NSPs). The successful supplier will be required to provide a space where spare parts and out of use assets can be stored throughout the contract term.
All of the requirements will be fulfilled by a single supplier, as a single point of contact for TfWM.
There are 4 key areas aligned with the requirements set out in this specification, these are:
- Reactive Highway Infrastructure Maintenance
- Planned Highway Infrastructure Maintenance
- Passenger Information
- Storage of spares and out of use assets
The Service Provider will provide TfWM with a service, including a number of dedicated operatives and vehicles, complete with a suitable smart mobile communication system that is compatible with TfWM's asset management IT system for the electronic upload of data relating to inspections, examinations, fault reporting, work completion reports, electrical works, maintenance and auditing.
Maintenance provision under this contract is varied but the majority of repairs are undertaken due to vandalism and typically involves repairs to glazing, bus shelter framework, bus stop pole damage or component items fitted to shelters or poles such as stop plates or seating. This work will include the removal and re-installation of bus shelters, stop poles or information points at existing or new sites.
The Service Provider will be required to work in partnership with TfWM and its Suppliers, including but not exclusive to the other principal Service Providers and partners who carry out cleaning, shelter manufacture, installation and advertising, to deliver the very highest standards of service provision.
TfWM has made a commitment to and is working to develop good practice in infrastructure sustainability, including green and sustainable technologies in the design, refurbishment and maintenance of transport infrastructure facilities. The Service Provider will be required to demonstrate a commitment to sustainability by integrating sustainable development into their operating practices and culture throughout the contract. This can be achieved by using low fuel consumption and emissions vehicles, optimising visits to each site, recycling of waste materials, disposing of any controlled waste in an approved manner, work with reusable components, using innovative designs and green technology or ethically sourced materials.
documents
- https://www.find-tender.service.gov.uk/Notice/010961-2026 , tenderNotice
- https://www.find-tender.service.gov.uk/Notice/011489-2026 , tenderNotice
- https://www.find-tender.service.gov.uk/Notice/012379-2026 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
7 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 Jan 2026 | Preliminary market engagement (UK2) | Procurement Act 2023 | 002164-2026 |
| 6 Feb 2026 | Tender notice (UK4) | Procurement Act 2023 | 010961-2026 |
| 9 Feb 2026 | Tender notice (UK4) | Procurement Act 2023 | 011489-2026 |
| 11 Feb 2026 | Tender notice (UK4) | Procurement Act 2023 | 012379-2026 |
| 22 Apr 2026 | Contract award (UK6) | Procurement Act 2023 | 036842-2026 |
| 5 Jun 2026 | Contract details (UK7) | Procurement Act 2023 | 053560-2026 |
| 16 Jul 2026 | Contract change (UK10) | Procurement Act 2023 | 067168-2026 |
more from West Midlands Combined Authority
- Advisory Due Diligence Support · 23 Jul 2026
- Provision of Gauge Corner Restoration activities for Midland Metro Limited throughout the Birmingham City Centre. · 22 Jul 2026
- Provision of Verkada-based system for Midland Metro Limited · 22 Jul 2026
- CDM principal designer in relation to EV CATS · 21 Jul 2026
- Health Narrative procurement · 20 Jul 2026
- Transforming Real Time Passenger Information- Ref 05052-2023 · £8,840,666 · 15 Jul 2026
- Demolition Works - Longbridge Site · 7 Jul 2026
- Dudley Port Rail Station Car Park Resurfacing · 3 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Temporary Traffic Management Services Framework · Stirling Council · £400,000
- Provision of Road Marking Services to North Lincolnshire Council · North Lincolnshire Council
- Road Markings & Associated Services · Barnsley Metropolitan Borough Council · £1,600,000
- BU1172024 Bangor University Winter Maintenance- Gritting and Associated Services · Prifysgol Bangor / Bangor University · £133,335
- Horsham District Council - Traffic Management Services · Horsham District Council · £460,000
- Vehicle-Activated Sign (VAS) & Driver Feedback Sign (DFS) Maintenance · Carmarthenshire County Council · £246,666
- Provision of Roadside Technology Spares · National Highways · £6,070,861
- ORT0162 -Roadside Technology Spares LOT 1 · National Highways · £7,740,386
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.