gvtcx

SONI074 DS3 System Services – Volume Capped – Gate 14

SONI Ltd Published 25 Mar 2026 Find a Tender

key details

Value£34,450,000 (£41,340,004 inc. VAT)
Statuscomplete
Category (CPV) 71314000
RegionNorthern Ireland
Deadline15 Jan 2026
Procedureopen
SME suitableYes
OCIDocds-h6vhtk-05f475

Awards (22)

This procurement was awarded to 5 suppliers. Values shown are per-award; the notice total is £34,450,000.

SupplierValueDateStatus
Altamuskin Windfarm Limited shared £1,066,735 9 Mar 2026 pending
Altamuskin Windfarm Limited shared £641,145 9 Mar 2026 pending
Altamuskin Windfarm Limited shared £317,307 9 Mar 2026 pending
Altamuskin Windfarm Limited shared £162,852 9 Mar 2026 pending
GridBeyond (formerly Endeco Technologies Ltd) shared £162,852 9 Mar 2026 pending
GridBeyond (formerly Endeco Technologies Ltd) shared £145,338 9 Mar 2026 pending
GridBeyond (formerly Endeco Technologies Ltd) shared £111,156 9 Mar 2026 pending
GridBeyond (formerly Endeco Technologies Ltd) shared £17,064 9 Mar 2026 pending
GridBeyond (formerly Endeco Technologies Ltd) shared £0 9 Mar 2026 pending
Orsted Onshore UK Limited shared £1,066,735 9 Mar 2026 pending
Orsted Onshore UK Limited shared £641,145 9 Mar 2026 pending
Orsted Onshore UK Limited shared £317,307 9 Mar 2026 pending
Orsted Onshore UK Limited shared £162,852 9 Mar 2026 pending
Powerhouse Generation Limited shared £145,338 9 Mar 2026 pending
Powerhouse Generation Limited shared £111,156 9 Mar 2026 pending
Powerhouse Generation Limited shared £17,064 9 Mar 2026 pending
Powerhouse Generation Limited shared £6,760 9 Mar 2026 pending
Wheelhouse energy (NI) Limited shared £1,066,735 9 Mar 2026 pending
Wheelhouse energy (NI) Limited shared £641,145 9 Mar 2026 pending
Wheelhouse energy (NI) Limited shared £317,307 9 Mar 2026 pending
Wheelhouse energy (NI) Limited shared £162,852 9 Mar 2026 pending
not named shared · · active

description

Following review by the Regulatory Authorities of the TSOs’ Report on Ensuring a Secure, Reliable and Efficient Power System in July 2011 the TSOs were requested by the SEM Committee to put in place a programme of work to solve the challenges associated with increased levels of penetration of variable non-synchronous renewable generation.

In response the TSOs formally commenced the DS3 Programme in September 2011. The overall aim of the DS3 Programme is to put in place the required changes to system policies, system tools and system performance to meet the challenges of operating the electricity system in a secure manner while achieving the 2020 renewable electricity targets. A key aspect of this operational challenge is the increase of System Non- Synchronous Penetration (SNSP) from the 2011 limit of 50% to 75%.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
12 Dec 2025 Tender notice (UK4) Procurement Act 2023 082303-2025
25 Mar 2026 Contract award (UK6) Procurement Act 2023 027525-2026

more from SONI Ltd

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.