Phase 2 Old Haymarket Public Realm Works

Merseytravel Published 2 Oct 2025 Find a Tender

key details

Statuscomplete
RegionNorth West
Procedurelimited
OCIDocds-h6vhtk-05a6b0

Award

SupplierValueDateStatus
HUYTON ASPHALT CIVILS LTD · · active

description

The purpose of this commission is to appoint a Contractor (Contractor) to deliver phase 2 of a project to reinstate the lost Monument to the Mersey Tunnel at Old Haymarket in Liverpool. Phases 1 and 2 of this project are being delivered under separate commissions.

Phase 1 of the project (not part of this commission), scheduled for completion in mid-2025, will construct a monument at the Queensway Tunnel entrance, Queensway Mersey Tunnel, Victoria St, Old Haymarket, Liverpool L1 6ER. The works will also include a reduced level dig and below ground services, with temporary surface reinstatement with asphalt.

Phase 2 (this commission) includes the delivery of the remaining public realm improvements to the same site which were not captured in phase 1, including:

  • site clearance
  • earthworks to new levels
  • drainage
  • below ground services
  • reinstatement of refurbished toll booths
  • foundations for street furniture and the toll booths
  • signage and other highway infrastructure modifications / relocations
  • street furniture, including an interpretive map
  • wall and handrail construction
  • bollard and vehicle management
  • resurfacing and build-up works
  • offset tree planting
  • other miscellaneous works as identified on the design drawings and specifications contained within this document

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
2 Oct 2025 Contract details (UK7) Procurement Act 2023 061673-2025

more from Merseytravel

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.