Framework Agreement for the Supply, Installation and Maintenance of Personal Lifts and Hoists
key details
| Value | £20,000,000 (£24,000,000 inc. VAT) |
|---|---|
| Status | complete |
| Category (CPV) | 44115600 +5 more |
| Region | North West |
| Deadline | 24 Sept 2025 |
| Procedure | open |
| OCID | ocds-h6vhtk-0590a6 |
Awards (8)
This procurement was awarded to 8 suppliers. Values shown are per-award; the notice total is £20,000,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| AMW LIFT & MOBILITY SERVICES LTD shared | £5,000,000 | 6 Jan 2026 | active |
| POLLOCK LIFTS LIMITED shared | £5,000,000 | 6 Jan 2026 | active |
| SLC CARE LIMITED shared | £5,000,000 | 6 Jan 2026 | active |
| STAIRLIFT SPECIALISTS LIMITED shared | £5,000,000 | 6 Jan 2026 | active |
| Stannah Lift Services Limited shared | £5,000,000 | 6 Jan 2026 | active |
| TK ACCESS SOLUTIONS LIMITED shared | £5,000,000 | 6 Jan 2026 | active |
| VLC (STAIRLIFTS) LIMITED shared | £5,000,000 | 6 Jan 2026 | active |
| WESSEX LIFT CO LTD shared | £5,000,000 | 6 Jan 2026 | active |
description
Knowsley Council, Trafford Council and Rochdale Borough Council are seeking to establish a Framework Agreement (the Contract) for the supply, installation and maintenance of personal lifts and hoists. The Framework Agreement is for the supply, installation, servicing, maintenance, removal and re-installation of stairlifts, vertical through floor lifts, steplifts and hoists that improve the access to facilities for disabled people with sensory and mobility loss. The supply and installation work will be carried out in both private owner occupied and housing association properties. The servicing and maintenance will be predominantly carried out in private owner occupier's household properties, but could also be required in other tenures. A small number of other items are serviced in respite services and in shared lives homes.
The Specification, together with the accompanying tender documents, outlines the full scope of requirements and invites submissions from suitably experienced suppliers.
The Framework Agreement (the Contract) will be for a period of 48 months. The Framework will be divided into four lots.
A pre-market engagement notice has not been completed as the contracting authorities determined market engagement is not required due to the route to market being open tender.
A planned procurement notice has not been completed as the contracting authorities do not wish to reduce the timescales of this tender.
The evaluation process consisted of verification of the bids received on the Chest and releasing these to the evaluation panel for evaluation. The panel reviewed and scored the bidders' responses and moderation meetings were held where a Procurement Category Manager ensured the evaluation process was conducted in a fair manner in accordance with the pre-determined criteria and scoring methodology set out at the time of invitations, with a consensus score being finalised with the panel. Commercial returns were then reviewed, with the Procurement Category Manager releasing the final results to the evaluation panel.
In the interest of transparency the total value of the Framework was set at £20m (ex VAT) The values per lot stated within this notice are estimates only and should not be taken as fac
documents
- https://www.find-tender.service.gov.uk/Notice/052530-2025 , tenderNotice
- https://www.find-tender.service.gov.uk/Notice/053814-2025 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
4 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Aug 2025 | Tender notice (UK4) | Procurement Act 2023 | 052530-2025 |
| 4 Sept 2025 | Tender notice (UK4) | Procurement Act 2023 | 053814-2025 |
| 8 Jan 2026 | Contract award (UK6) | Procurement Act 2023 | 001288-2026 |
| 3 Jun 2026 | Contract details (UK7) | Procurement Act 2023 | 052147-2026 |
more from Knowsley Council
- Plantation Roof Access and Fall Protection Works · 16 Jul 2026
- Passive Fire Protection Remedial Works at Plantation Primary School · 16 Jul 2026
- Relocation of Post-16 Provision to the Kirkby Centre (Phase 2) · 8 Jul 2026
- Alt Bridge Expansion Phase 3 - Wellcroft Centre · 7 Jul 2026
- Framework for Repairs & Renovations · 7 Jul 2026
- School Entry Hearing Screening Service · £63,000 · 7 Jul 2026
- Public Contract for Rough Sleeping Outreach and Single Homelessness Navigation Support Service · 1 Jul 2026
- Strategic Housing Market Assessment · £50,000 · 30 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Stairlift Servicing and Call Outs - Leeds Building Services · Leeds City Council · £99,000
- Supply of Stairlifts (Inc. Repairs and Maintenance of Equipment in Situ) · North Northamptonshire Council · £400,000
- Lifts, Platform Lifts and Stairlifts Service and Maintenance · HAFOD HOUSING ASSOCIATION LIMITED · £959,524
- Aids and adaptations to dwellings and access to dwellings · Redditch Borough Council · £600,000
- Provision of stairlifts, floor lifts and maintenance · Ashford Borough Council · £255,000
- Stairlifts, Steplifts and Through Floor Lifts · Wyre Council · £450,000
- Supply and Installation of Stairlifts and Ceiling Track Hoists · Chesterfield Borough Council · £1,500,000
- Stairlifts and Lifting Equipment Framework 2026 · Stairlifts and Lifting Equipment Framework 2026 · £100,000,000
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.