DSM to STEP Plasma control
key details
| Status | complete |
|---|---|
| Region | South East |
| Procedure | direct |
| OCID | ocds-h6vhtk-058a51 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| TSM Engineering | · | · | active |
description
The purpose of this contract is to implement a system engineering methodology, based on the Design Structure Matrix (DSM) approach as defined in a recent paper (ref: [1]), to model plasma control interfaces, both within the plasma and with external plant systems. This will support the development of an interface model for a spherical tokamak based fusion power plant. In turn, this is expected to inform the selection of a tokamak sensor set that meets functional, redundancy and availability requirements for the plasma control needs of the STEP prototype plant.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=974429407
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 19 Aug 2025 | Contract details (UK7) | Procurement Act 2023 | 049715-2025 |
more from UK INDUSTRIAL FUSION SOLUTIONS LIMITED
- MAST-U EBW Transmission Line PSQ · 10 Sept 2026
- MTC membership · £200,000 · 2 Sept 2026
- HiCrIS Full Design & Build · 25 Aug 2026
- PMEN UKFE - 259 Aluminium Waveguide Straightness · £20,000 · 24 Aug 2026
- Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON) · £200,000 · 17 Aug 2026
- STEP Programme Reporting Development · £387,000 · 12 Aug 2026
- HVAC concept-level study · £70,000 · 6 Aug 2026
- High Field Testing · £32,000 · 6 Aug 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.