Lot C: River Colne Constructed Wetland Outline Design and Feasibility
key details
| Value | £25,000 (£30,000 inc. VAT) |
|---|---|
| Status | active |
| Category (CPV) | 45246000 +2 more |
| Deadline | 12 Sept 2025 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-0589a1 |
description
This tender will encompass the following activities.
- Topographical, hydrological, sediment and water quality surveys to understand the through-flow regime, likely input quality and quantities for a range of surface water run-off conditions.
- Strategic investigation of on-site ground contamination and suitability of existing sediments for re-use or to allow identification of requirements for disposal (including Water Regulations (WR), Waste Management (WM3), and Waste Acceptance Criteria (WAC) as needed).
- Biodiversity Net Gain assessment and Preliminary Ecological Appraisal highlighting lessons learned from the historic wetland design where evidence exists.
- A multi-criteria options appraisal matrix to record and assess relative costs and benefits of a variety of sub-options and approaches to determine an evidenced preferred option.
- Lead a stakeholder workshop and consultation exercise.
- Provide appropriate information design to support discussions with stakeholders including reference to options for sediment movement volumes, space for sediment drying / processing area, gravel quantities / sourcing, water volume and retention requirements for functional filtration and water quality improvements, options for widening boundary onto playing fields if needed, etc re design and permitting constraints.
- Develop the preferred option into a more formalised and feasible outline design that can be used in wider consultation and in early permitting discussions to enable an iterative design process and clearly specifies the required detail going forwards.
- Identify the requirements for gaining consents.
- Create / initialise necessary documentary evidence and applications for consents to build, using approved outline designs.
- Attend regular meetings with the project manager and external stakeholders (as agreed) to inform design process. See detail in section 4.
- Include detail of the likely management and maintenance requirements post construction to ensure sustainability and longevity of the constructed wetland. To include description, scale and optimal frequency of necessary ongoing maintenance activities where relevant.
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-Watford:-River-regulation-and-flood-control-works./BQW35F353G
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/BQW35F353G
documents
- https://www.find-tender.service.gov.uk/Notice/049440-2025 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Aug 2025 | Tender notice (UK4) | Procurement Act 2023 | 049440-2025 |
more from Lot C: River Colne Constructed Wetland Outline Design and Feasibility
- Herts & Beds Air Quality Data Management · £42,000 · 30 Jul 2026
- Hard FM Services · £2,000,000 · 23 Jul 2026
- Cherry Tree Allotments Expansion · £400,000 · 21 Jul 2026
- AVIT Software - Museum of Watford · £280,000 · 8 Jul 2026
- Temporary Accommodation Management and Maintenance · £2,700,000 · 4 Jun 2026
- Scriptwriter / Copy Editor for the Museum of Watford · £25,000 · 28 Apr 2026
- Innovation Hub, Watford Borough Council · £4,500,000 · 20 Apr 2026
- Museum of Watford AV Software Development Tender · £280,000 · 31 Mar 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- YNE-AOMR Lot 1-North East Area Asset Recon Programme 26 to 27 · Environment Agency · £946,499
- YNE AOMR Lot 1 Asset Recon Nunnington Channel Works · Environment Agency · £76,486
- YNE AOMR Lot 1 Asset Recon Skerne South Park Fish Pass Renovation · Environment Agency · £46,798
- YNE - AOMR Lot1&3 Incident Response stonbury · Environment Agency · £1
- YNE AOMR Lot 1 Asset Recon Thorpe Marsh - B3 · Environment Agency · £95,592
- YNE AOMR Lot 1 Asset Recon Lowther B Spillway - C15 · Environment Agency · £119,343
- YNE-AOMR Lot 1-North East Area Asset Recon Programme 26 to 27 · Environment Agency · £946,499
- SSD - PFR Scheme Hampshire (Romsey, Otterbourne, etc.) Lot 2 Supply & Install · Environment Agency · £598,522
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.