Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets

LANCASHIRE RENEWABLES LIMITED Published 6 Mar 2026 Find a Tender

key details

Value£2,000,000 (£2,400,000 inc. VAT)
Statuscomplete
Category (CPV) 50531200 +1 more
RegionNorth West
Deadline25 Nov 2025
Procedureopen
SME suitableYes
OCIDocds-h6vhtk-058364

Award

SupplierValueDateStatus
GENSERV NORTHWEST LTD £2,000,000 12 Jan 2026 active

description

Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council.

Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB).

Until 2014, LRL had an anaerobic digestion (AD) process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM TCG 2020K V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid.

The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. It is estimated that the gas engines were only used for approximately 10000 hours prior to being decommissioned, having being installed circa 2010.

As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at:

Lancashire Renewables Limited

Farington Waste Recovery Park

Sustainability Way

Leyland

PR26 6TB

To facilitate this, 2 no. gas engines / gensets are required to be brought back into operational service at LRL's Leyland site. Therefore, the contract will include offsite initial refurbishment, delivery back to site, installation and testing, followed by ongoing service and maintenance. It is likely that the initial refurbishment and install back on site of the two gensets must be completed by 31/03/2026.

It is possible that the same works may be undertaken, and hence the contract could require an additional 2 no. gas engines / gensets of the same manufacturer and model at LRL's Thornton facility. The contract will include provision for this, although it is to be decided at a later date whether this will be exercised.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

5 notices published against this procurement.

PublishedTypeRegimeNotice
7 Aug 2025 Preliminary market engagement (UK2) Procurement Act 2023 046928-2025
8 Oct 2025 Tender notice (UK4) Procurement Act 2023 063318-2025
13 Nov 2025 Tender notice (UK4) Procurement Act 2023 073643-2025
12 Jan 2026 Contract award (UK6) Procurement Act 2023 002425-2026
6 Mar 2026 Contract details (UK7) Procurement Act 2023 020195-2026

more from LANCASHIRE RENEWABLES LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.