gvtcx

DPPA framework (Supplier funded On-site renewables)

NETWORK RAIL INFRASTRUCTURE LIMITED Published 1 Apr 2026 Find a Tender
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£220,000,000 (£260,000,000 inc. VAT)
Statusactive
Category (CPV) 09310000 +3 more
Procedureselective
OCIDocds-h6vhtk-056076

description

Introduction

Network Rail (NR) is a public-sector organisation which owns, operates and maintains the rail infrastructure in the United Kingdom. Network Rail owns and operates 20,000 miles of track, 30,000 bridges, tunnels and viaducts and thousands of signals, level crossings and stations, as well as offices and depots across the country. We manage 20 of the UK's largest stations while all the others, over 2,500, are currently managed by the country’s Train Operating Companies (TOC’s). Although this may change with the nationalisation of the Train Operating Companies and the creation of Great British Railways (GBR).

Background

Network Rail, including TOC’s, use approximately 4.5TWh of electricity a year, about 0.5TWh is used by NR to power our stations, offices, depots, signals etc. (non-traction power) with the other 4TWh used to power the trains (Traction power).

NR has a well-established Transition to Renewables (T2R) programme which includes both on-site renewables, via capital investment and supplier funded, and Corporate Power Purchase Agreements (CPPA’s). NR has a target to transition all non-traction consumption to renewables by 2030.

Overview

Network Rail intends to establish a framework of five capable and experienced suppliers to support the delivery of on-site or near site supplier funded renewable energy solutions delivered through Power Purchase Agreements (PPA).

The framework will support a variety of renewable energy deployment types, including:

Rooftops installations
Car park solar canopies
Ground-mount systems
High energy consuming sites with potential to secure nearby land option.

The framework will be technology agnostic, allowing for Solar PV, on-site wind turbines, and future emerging technologies, with the option to include energy storage solutions where appropriate.

The framework will be awarded to five suppliers and be valid for 8 years. It will be available for use across Network Rail, as well as covering the nationalised ToC’s and GBR, including any affiliates. Call-offs will be run as mini competitions through the framework for individual sites or a portfolio of sites. Each resulting call-off contract will be for a term of up to 25 years depending on the technology and project requirements. At the end of the contract there may be an option to:

Purchase the renewable assets, or
Extend the contract at a reduced price, or
Require the removal of the asset and reinstatement of the site.

An initial award of up to five sites will be made to the highest scoring supplier, subject to feasibility and affordability. Further information is included in the procurement documents.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

4 notices published against this procurement.

PublishedTypeRegimeNotice
16 Jul 2025 Preliminary market engagement (UK2) Procurement Act 2023 040580-2025
17 Jul 2025 Preliminary market engagement (UK2) Procurement Act 2023 040722-2025
17 Jul 2025 Preliminary market engagement (UK2) Procurement Act 2023 040724-2025
1 Apr 2026 Tender notice (UK4) Procurement Act 2023 030444-2026

more from NETWORK RAIL INFRASTRUCTURE LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.