UK2 - Preliminary Market Engagement Notice Template - Track Maintenance
key details
| Value | £39,000,000 (£46,800,000 inc. VAT) |
|---|---|
| Status | planning |
| Category (CPV) | 45234116 |
| Region | South East, London |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-06d43c |
description
The works required include but not limited to the following:
The works will be to undertake all aspects of Permanent Way projects as either a support service to the internal delivery team or to undertake the full service detailed in the full Scope document to provide specialist support to the Southern Region.
| • | Plain line conventional replacement - Conventional Plain Line renewals cover all works undertaken within Categories 4, 11, 16, 14, 2 and 1, which collectively cover steel relay, complete renewal (with or without formation) and double or single rail-based works. |
| • | Plain Line Refurbishment - Plain Line Refurbishment covers all works undertaken within Categories 6,7,9, 12, 13, Heavy Refurb (other), 3, Medium Refurb (concrete), 21 and Medium Refurb (other) which collectively sit within Heavy Refurb (other), Medium Refurb (concrete) and Medium Refurb (other). Refurbishment work is intended to extend the life of the existing track asset rather than fully renew it. |
| • | S&C Renewal - Renewal covers all works undertaken within Categories 70, 71, 72 and 73, which sit within either Full Renewal or Abandonment. |
| • | S&C Refurbishment - S&C refurbishment covers all works undertaken within Categories 74, 75, Heavy Refurb (concrete), Heavy Refurb (other), Medium Refurb (concrete) and Medium Refurb (other), which sit within the Heavy Refurb or Medium Refurb roll-up. |
| • | Full or spot re-sleepering – Renewal & replacement of single, multiple or all sleepers either as part of other works or individual delivery items (Cat 30). |
| • | Slab Track - Slab track works relating to the maintenance |
| • | Track Drainage – works associated with the maintenance of existing Railway drainage systems including minor component replacement |
| • | Timbers – renewal of Longitudinal Timbers (Cat 41) or Level Crossing surfaces (Cat 45) and wheel timbers (Lot One Only). |
| • | Re-ballasting – Replacement of existing ballast including shoulders, and track formation |
| • | Scrap collection and line of route clearance (Cat 47). |
| • | Minor maintenance response – when directed, providing response within 1 hour to asset failures, including but not limited to: lifting and packing, manual ballast reprofiling, fitting rail clamps, applying ties bar, replacement of damaged plates and applying or removing speed restriction equipment |
| • | Maintenance and renewal of track lubrication equipment, on both plain line and S&C |
A full scope of the works will be available at PSQ Stage.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Jul 2026 | Preliminary market engagement (UK2) | Procurement Act 2023 | 070759-2026 |
more from NETWORK RAIL INFRASTRUCTURE LIMITED
- Provision and Maintenance of Ultrasonic Rail Flaw Detection Devices · 29 Jul 2026
- UK4 - Tender Notice Template - Network Design & Integration Services · £32,000,000 · 28 Jul 2026
- TRU TRUST: Immersive Training Service - Market Engagement · £0 · 23 Jul 2026
- High Voltage/Low Voltage Switchgear Tender Notice 04 · £13,600,000 · 22 Jul 2026
- Depots Package B – Doncaster West, Doncaster Belmont, Tyne Yard ES4-5 · £83,333 · 20 Jul 2026
- Eastern Region RRV Replacement · £16,000,000 · 16 Jul 2026
- Network Rail National Risk Assessment Redesign · £0 · 16 Jul 2026
- UK4 - OTM Conveyor Maintenance & Spares · £4,295,238 · 15 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Provision of Priestfield Mitigations LC084 - Phase 1 - Ballast Distribution Works for Midland Metro Limited (MML) · West Midlands Combined Authority
- Rodney Stoke Access Track Improvements · Natural England · £20,833
- Provision of Ballast Storage Area for Midland Metro Limited · WEST MIDLANDS COMBINED AUTHORITY · £34,396
- Provision of Track Baseplate Rectification Works for Midland Metro Limited - The Crescent Tram Stop · WEST MIDLANDS COMBINED AUTHORITY · £287,473
- Provision of Manual Rectification Team for Track Faults for Midland Metro Limited · WEST MIDLANDS COMBINED AUTHORITY · £114,326
- MML Low Level Resurfacing Works - The Crescent Tram Stop · WEST MIDLANDS COMBINED AUTHORITY · £357,896
- MML Rail Ballasted NEC4 Term Service Contract · WEST MIDLANDS COMBINED AUTHORITY · £954,000
- MML Tamping & Geometry Term Service Contract · WEST MIDLANDS COMBINED AUTHORITY · £879,600
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.