STEP P&T – High Heat Flux Testing and Verification Facility
key details
| Status | complete |
|---|---|
| Procedure | direct |
| OCID | ocds-h6vhtk-055ed8 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| ICS COOL ENERGY LIMITED | £293,959 | 15 Oct 2025 | active |
description
An integrated system that will provide cooling for the high heat flux testing for the STEP in-vessel components, as well as cooling the auxiliary systems required for operation, as part of the High Heat Flux Testing and Verification Facility. This system will include:
Temperature Control Unit (226 kW cooling capacity, 150 kW heating capacity and a maximum operating temperature of 350°C)
Chiller (350 kW cooling capacity)
Design of the Temperature Control Unit and Chiller System, along with all necessary components for operation.
Commissioning of the system.
Installation of the system.
This system is very similar to the operational HIVE test rig which has used this supplier for the last seven years and shares the same fundamental design concept, many similar components, the cooling system and operational principles. These specific nuances are currently only understood by ICS Cool Energy.
This project is an extension of the organisation’s Induction-heating based HHF testing programme and there is a stakeholder requirement to ensure equipment is directly comparable, and compatible to the HIVE facility, including physical interfaces, control, and data acquisition (see approved TD-0012050-A: SHR-010, SHR-011, SHR-013). As a result another supplier would have to retrofit the HIVE test to match the proposed HHFTVF facility increasing the cost beyond what we have been quoted.
The absence of this system poses a significant technical risk to the project, as it will result in certain key stakeholder requirements falling out of scope and lead to a diminished operational capability, such as the inability to accurately replicate the first wall environment as well as future use cases. (see approved TD-0012050-A: SHR-008, SHR-009, SHR-016)
To view this notice, please click here:
https://ukifs.delta-esourcing.com/delta/viewNotice.html?noticeId=997133124
notice history
3 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Jul 2025 | Transparency notice (UK5) | Procurement Act 2023 | 039725-2025 |
| 16 Oct 2025 | Contract award (UK6) | Procurement Act 2023 | 066094-2025 |
| 5 Dec 2025 | Contract details (UK7) | Procurement Act 2023 | 080201-2025 |
more from UK INDUSTRIAL FUSION SOLUTIONS LTD
- Laser Induced Desorption System for Measuring First Wall Retention in STEP · £75,000 · 27 Jul 2026
- Corrosion Testing Framework for STEP · £6,000,000 · 22 Jul 2026
- Palladium Silver Membranes Tensile and Fatigue Testing · £165,000 · 20 Jul 2026
- PLANC (Permitting, Licences, Authorisations, Notifications & Consent) Assurance · £1,200,000 · 17 Jul 2026
- STEP UKFE Leadership Training · 17 Jul 2026
- STEP Transition Support · 17 Jul 2026
- STEP Vapour Shielding Scenario Simulation · £200,000 · 16 Jul 2026
- Plant Control Systems Functional Assessment · £0 · 9 Jul 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.