Consultancy Services for Energy Infrastructure Improvement projects supporting the delivery of Net Zero targets
key details
| Status | complete |
|---|---|
| Procedure | direct |
| OCID | ocds-h6vhtk-04f9a8 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| THE CARBON AND ENERGY FUND LIMITED | £201,600,000 | · | cancelled |
description
Supply will be under a proposed public sector building net zero framework managed by the Carbon and Energy Fund Limited (CEF), to propose design and implement a series of improvements to take public buildings to net zero, repaid through guaranteed savings. Suppliers will consider the main routes to net zero which are available in the UK, namely geothermal energy, green district heating energy, hydrogen or biogas delivery, coupled with onsite comprehensive initial and ongoing low carbon energy efficient infrastructure services, improvements and upgrades to existing or new facilities.
The scope of services spans the full range of energy infrastructure measures and comprise 4 Lots: -
| • | Lot 1 - On-site Energy Reduction and Carbon Mitigation Measures: Covers a broad range of energy efficiency technologies, including LED lighting, BEMS controls, insulation, CHP, solar PV, boilers, battery storage, and internal building works. |
| • | Lot 2 - Geothermal Infrastructure: Involves the design and delivery of ground source and deep geothermal heating systems. |
| • | Lot 3 - District Energy Networks: Supports delivery of heating and cooling networks serving multiple buildings or sites. |
| • | Lot 4 - Green Fuel Infrastructure: Covers hydrogen-ready boilers, biogas systems, and dual-fuel or hybrid energy technologies." |
Call-off under the framework will be via mini-competition to appoint a supplier as energy partner to a CEF member throughout the entire project.
CEF manages the entire net zero project on behalf of its members, including the provision of legal and technical advice, a copyrighted call off contract and suite of framework documents, monitoring and verification of savings throughout the entire contract term (typically 15 years), business case support, contracting authority approvals, off balance sheet treatment for Eurostat and IFRIC 12 and, if required, project finance.
documents
- https://www.find-tender.service.gov.uk/Notice/027777-2026 , tenderCancellationNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Mar 2025 | Transparency notice (UK5) | Procurement Act 2023 | 011618-2025 |
| 26 Mar 2026 | Procurement termination (UK12) | Procurement Act 2023 | 027777-2026 |
more from COUNTESS OF CHESTER HOSPITAL NHS FOUNDATION TRUST
- Maintenance of Cath Lab Trollies · £22,934 · 7 Sept 2026
- Ward 60 Improvement Works · £72,515 · 4 Sept 2026
- Siemens Atellica Middleware · £32,430 · 3 Sept 2026
- Replacement of critical AHU Plant Ward · £10,000 · 17 Aug 2026
- Partial Knee Replacement · £30,000 · 14 Aug 2026
- Open Space and Field Assessment - 1829 Car Park · £12,700 · 11 Aug 2026
- Legal Fees and Charges · £13,384 · 3 Aug 2026
- EPH Car Park Works · £44,347 · 3 Aug 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.