The Bakerloo Line runs through London from Harrow & Wealdstone, in the North, to Elephant & Castle in the centre with plans to extend South as part of the Bakerloo Line Extension initiative. The Bakerloo line fleet (72 Tube Stock) is now the oldest rolling stock operating in the UK with considerable costs to life-extend the fleet and significant risks to reduction in reliability. The ongoing operating costs are a concern and upgrading the rolling stock requires considerable depot and lineside infrastructure improvements to facilitate the introduction. This notice looks to address the associated infrastructure works required to improve whole life maintenance costs and service reliability for the line.
TfL intends to introduce the new rolling stock onto the Bakerloo line by, circa 2030. The introduction of new rolling stock would require a significant modification or upgrading of the line’s infrastructure to support the new fleet, by 2028.
TfL wishes to engage the market to establish appetite and seek feedback on emerging approaches or alternative/innovative delivery methodologies for the proposed depot upgrade and line wide infrastructure works that would enable the fleet introduction.
A high-level summary of assets within the scope of this works is provided below:
| • | DC Power |
| • | HV Power |
| • | LV power supply |
| • | Stations & Property |
| • | Platform Train Interface |
| • | Civils & Structures |
| • | Track |
| • | Signalling & communications |
| • | Depot maintenance sheds, fan roads & Stabling |
The scope of this market engagement aligns with the early stage of the current programme lifecycle, acknowledging that the delivery and contracting methodologies are not yet confirmed while we look to develop the strategy using this exercise to test and mature our way of thinking. The programme will be using this market engagement to inform our strategy which currently preferences an early contractor involvement approach.
The contractors’ experience of delivery and options on building sequence could significantly influence the concept design as well as the detailed design. TfL have a drive to improve construction efficiencies to reduce cost and look at innovative techniques to reduce carbon to meet the net zero gain, with improved whole life costs.
It is assumed that the breadth of disciplines will likely need joint contractor support or specialist subcontractor involvement at the contract stage. Therefore, joint or individual supplier engagement is considered at this stage.
Respondents to this notice will receive a Market Sounding Questionnaire (MSQ) for completion and will be invited to an Industry Day around end-April to learn more about BLU Programme. If you are interested, please respond by COB Tuesday 9 April 2024.
This is a pre-procurement activity and does not imply any commitment to any future procurement process at this time. The purpose is to seek feedback on TfL’s approach, appetite from industry and information on alternative solutions that are being developed in the marketplace for similar schemes. Participation in the PIN and subsequent MSQ is not a prerequisite to, and will not prejudice, participation in any future competitive process. The information contained in this PIN or in any communication made between TfL and any supplier in connection with this should not be relied upon as constituting a contract, agreement, or representation that any contract will be offered as a result of this PIN and MSQ. If TfL decides to progress with any procurement exercise for BLU, TfL will publish a separate contract notice.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Mar 2024 | Prior information notice (F01) | Earlier regulations | 007594-2024 |
more from Transport for London
- Qualitative and Quantitative Research (TfL 96996) · 8 Jul 2026
- TfL Long Term Storage Managed Services · 23 Apr 2026
- Dial-a-Ride and Capital Call Taxi Consolidator - Call-Off Contract · 20 Apr 2026
- Specialist Track Labour Framework · 17 Mar 2026
- Bogie Framework Repairs and Overhaul for Engineering Vehicles · 3 Mar 2026
- Customer Satisfaction Survey (TfL 96997) · 25 Feb 2026
- Electric Vehicle Infrastructure Delivery (EVID) Tranche 2, Batch 2 · 20 Feb 2026
- Retail Specific Campaigns, Vinyl's and Hoardings · 19 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Mid Cornwall Metro Implementation Agreement · Cornwall Council · £29,178,009
- Mid-Cornwall Metro · Cornwall Council · £2,499,687
- Earthing and Bonding · Transport for Wales · £12,000,000
- High Voltage (HV) Power Framework · London Underground Limited (LUL)
- Feltham Phase 5 Civils Works · Network Rail Infrastructure Ltd · £6,473,365
- Tramway Maintenance Services · Blackpool Council · £500,000
- Northumberland Park Signalling Depot Advanced Works Track Circuit Conversion · Transport for London · £825,156
- Site Support Services Framework · Transport for London · £347,880
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.