Architect Lead Design Team for the New Development of Leighton Hospital Campus
key details
| Value | £4,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 71220000 +1 more |
| Region | North West |
| Deadline | 16 Feb 2024 |
| Procedure | selective |
| OCID | ocds-h6vhtk-042e03 |
description
Mid Cheshire Hospitals NHS Foundation Trust (MCHFT) (the "Authority") is issuing this Invitation to Tender ("ITT") in connection with the competitive procurement of Architect Lead Design Team Services for the New Development of Leighton Hospital Campus. <br/><br/>This procurement will be run via a Restricted Procedure under the Public Contracts Regulations 2015 ("PCR").<br/><br/>MCHFT is in the initial stages of a new project to construct a new hospital, which will replace the existing Leighton Hospital which is affected by Reinforced Autoclaved Aerated Concreate (RAAC) throughout circa 80.00% of its buildings. The vision for the project is to design and build a new state of the art hospital that will play a vital role at the heart of the community, placing digital innovation at the forefront of health services designed to tackle inequalities and meet the needs of a growing and ageing population. The ambition is that this project will transform the quality of healthcare for the people of Cheshire and across the Northwest of England.<br/><br/>At the centre of the programme will be the “hospital 2.0” concept, a vision for how hospital schemes can be delivered with greater efficiency and reduced cost. An integrated systems approach will provide “optimised, standardised and repeatable solutions for scheme development, design, construction, and operation. <br/><br/>The purpose of this procurement exercise is to appoint an Architect Lead Design Team (including Mechanical, Electrical, Structural, Digital Architect) to provide services covering RIBA Stages 2 to 3.<br/><br/>The Authority is seeking interest from consultants who will provide the service of an Architect who will also act as the lead design coordinator of an Architect-Led Design Team (ALDT), including Wayfinding, Digital Architect, and the below services:<br/><br/>Core Architectural Services, Lead Design Coordinator and the below specialisms:<br/>• Medical Equipment<br/>• Daylight/Sunlight<br/>• Wind<br/>• Landscaping<br/>• Catering<br/>• Waste and Logistics<br/>• Lighting<br/>• Acoustics<br/>• Inclusive Design<br/>• Façade Access<br/>• Façade Engineering<br/><br/>Core Mechanical, Electrical and Plumbing (MEP) Engineering Services and the below specialisms:<br/>• BREEAM<br/>• Net Zero Carbon<br/>• IT and AV<br/>• Lifts<br/>• Security<br/>• Fire Engineering<br/><br/>Core Civil and Structural (C&S) Engineering Services and the below specialism:<br/>• Transport Planning<br/><br/>Please note that Principal Designer services are to be provided by others and not by the Architect Lead Design Team.<br/><br/>The Authority reserves the right to extend the contract for the Architect Lead Design Team beyond RIBA stage 3 without the need for a further procurement exercise but through way of novation. In exercising its discretion to extend, the Authority will consider the successful bidder’s performance up to the point it is considering any extension and weather any benefit to the overall programme to extending with the current supplier outweighs any potential benefit in carrying out a further procurement exercise.<br/><br/>The contract will include the NEC4 Professional Service Contract (PSR) set out in Annex A1. It is vital that the bidder review these carefully and take account of all information such as key performance indicators and insurance requirements and that the tender fully takes account of these. By submitting a tender, bidders are agreeing to be bound by the terms of this ITT and the NEC4 Professional Service Contract (PSR) without further negotiation or amendment.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Jan 2024 | Contract notice (F02) | Earlier regulations | 001666-2024 |
more from Mid Cheshire Hospitals NHS Foundation Trust
- RAAC Programme 2026/27 - Quantity Surveyor and Cost Management Services · £500,000 · 23 Apr 2026
- Leighton Hospital Asbestos Management · £560,000 · 27 Jan 2026
- Leighton Hospital Asbestos Removal · £1,000,000 · 27 Jan 2026
- MCHFT RAAC Structural Engineering & Survey Inspections · £2,289,010 · 2 Oct 2025
- Provision of an integrated Referral and Advice & Guidance system · 12 Jun 2025
- Water Hygiene - Healthier Futures · £43,750 · 8 May 2025
- Engineer advice up to RIBA Stage 2 for Fire - Healthier Futures · £43,750 · 8 May 2025
- Provision of Legal Services for the New Leighton Hospital · £173,140 · 11 Apr 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of Direct Award-26CP027-QEUH-QEUH Emergency Department Redesign-Lead Consultant · NHS Greater Glasgow and Clyde · £19,942
- Oxford - Architect Services · NETWORK RAIL INFRASTRUCTURE LIMITED · £1,900,000
- New Museum Project - Deep Time Gallery: Exhibition Lead Designer · London Museum · £300,000
- Design Lead for Linwood School Satellite Expansion · Bournemouth, Christchurch and Poole Council · £300,000
- Sleep Studies and LTV - Design · Chelsea and Westminster Hospital NHS Foundation Trust
- Mechanical and Electrical Services Stage 4 Design in relation to Theatre 5 and Theatre 6 located on Level 5 at Chelsea and Westminster Hospital. · Chelsea and Westminster Hospital NHS Foundation Trust · £150,156
- Wawne Road Hull - EA · THIRTEEN HOUSING GROUP LIMITED · £51,870
- Gamma Camera - Architect · Guy's and St Thomas' NHS Foundation Trust · £42,209
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.