Campus Development Programme Phase 1

UNIVERSITY OF EAST ANGLIA Published 2 Aug 2024 Find a Tender

key details

Statuscomplete
Category (CPV) 45000000
RegionEast of England
Deadline6 Dec 2023
Procedureselective
OCIDocds-h6vhtk-04161e

Award

SupplierValueDateStatus
Mace Construction Ltd · · active

description

The University of East Anglia was created during the 1960s. Its original campus buildings were designed by the acclaimed architect Sir Denys Lasdun and several of the original

buildings are now Grade II Listed, including the original teaching and science building the 'Lasdun Wall'.

The Grade II listed Lasdun Wall is an iconic and important part of University of East Anglia's (UEA) history situated in the centre of the UEA's vibrant and busy 24/7 campus. However, the building needs repair and refurbishment to address condition issues and to deliver essential sustainability improvements to enable the University to meet their target to be a net zero campus by 2045.

The Lasdun Wall comprises four buildings constructed to appear as one (Building 3, Building 4, Building 5 and Building 6). The University plans to carry out a four-phase strip-back-to frame refurbishment of the Lasdun Wall.

This project - Lasdun Wall Refurbishment Phase 1 - will deliver new modern science facilities and teaching space in an extended Building 3, whilst existing science research facilities continue to operate within Buildings 4, 5 and 6. The existing science facilities are currently at risk due to potential condition failures of the buildings, therefore the success of Phase 1 to 'de-risk' highly specialised facilities within the Lasdun wall, is of extreme importance to the University.

The University's "Phase 1" project consists of three elements:

  • Preliminary enabling works (by others)
  • The Main Works (the subject of this contract)
  • A package of interphase enabling works which will complete Phase 1 and prepare for the

future decommissioning of Buildings

The appointed Main Contractor will be required to undertake the following:

Initial phase of strip out and asbestos removal will have been undertaken to provide an empty shell, however asbestos removal will be required by the main contractor as follows:

  • Facades - Around existing windows which will be replaced, and concrete façade panels removed to accommodate the new extension.
  • Existing floor screed abutting the perimeter which includes asbestos contamination around existing fixings to the retained listed concrete façade panels - fixings and all remaining

screeds will need to be removed.

  • Asbestos removal

Extension - An extension of approx. 2,966m² is planned to one elevation.

Window Replacement and Façade Treatment

Fitting Out of existing building - The re-fit comprises circa 11,287m² of space split to include science research facilities and teaching and social learning space.

External Works

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
6 Nov 2023 Contract notice (F02) Earlier regulations 032794-2023
2 Aug 2024 Contract award notice (F03) Earlier regulations 024238-2024

more from UNIVERSITY OF EAST ANGLIA

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.