gvtcx

T23-070CAP Acorn Farm Project Contractors PQQ Application

Derry City and Strabane District Council Published 29 Feb 2024 Find a Tender

key details

Value£4,500,000
Statuscomplete
Category (CPV) 45200000 +3 more
RegionNorthern Ireland
Deadline15 Sept 2023
Procedureselective
OCIDocds-h6vhtk-03ee6a

Award

SupplierValueDateStatus
McKelvey Construction Ltd. · · active

description

Acorn Farm is a walled brownfield site located on a vacant plot of land within St Columb’s Park off St. Columb’s Road opposite the former Ebrington Barracks site in Derry/ Londonderry. Acorn Farm is approximately 0.874 hectares in area. The site is in a predominately residential and commercial area and access to the site can be gained from St Columb’s Road (South). The site is bounded by St. Columb’s Road to south and by St. Columb’s Park on all other sides. The site was formerly used as accommodation for the RUC and a helicopter pad serving the barracks. Ebrington Barracks was closed in 2003. Site clearance and ground levelling work was completed in 2022 as part of site enabling works. The Council has completed works to remove vegetation, hardstandings, concrete bases, steps, retaining walls and redundant underground services across the site and the ground flattened to an even gradient. Although, the council cannot rule out the possibility that some buried infrastructure might have been missed during this pre-commencement site clearance contract. Trees remain along the southern boundary along with the boundary walls, manholes along with northern edge and piles of crushed hardcore and compost. The overall aim of the Acorn Farm project is to transform a former MOD derelict site into a growing space as a centre of Permaculture excellence in the Northwest City Region. The Acorn Project will facilitate the development of new food growing technologies and to deliver a capital project which is an exemplar as a climate smart net zero/nearly zero carbon project, incorporating the use of circular economy principles, sustainable energy and energy/resource efficient technologies. Derry City and Strabane District Council (DCSDC) has developed a Climate Change Adaptation Plan (2020) and a Climate Change Emergency Pledge (2020) outlining the Council's climate action commitments, including a shift to net zero greenhouse gas emissions and climate resilience across the city and district by 2045. The ambition for the Acorn Farm site including the buildings, external works and landscape is to achieve climate resilience and whole life net zero emissions or nearly net zero emissions. The project is for the provision of a community enterprise to provide a unique urban growing space within the City. Please refer to CfT documents for further information. Addendum 1 is PQQ, Addendums 2-10 incl are draft ITT Documents

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
9 Aug 2023 Contract notice (F02) Earlier regulations 023292-2023
29 Feb 2024 Contract award notice (F03) Earlier regulations 006577-2024

more from Derry City and Strabane District Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.