Workington Gateway
key details
| Value | £3,790,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 |
| Deadline | 11 Oct 2024 |
| Contract start | 21 Oct 2025 |
| Contract end | 30 Jan 2026 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-e3c84b91-a8bb-499f-8ee3-d978f249e528 |
Awards (2)
This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is £3,790,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| Story Contracting Limited | £224,335 | 22 Nov 2024 | active |
| Story Contracting Ltd | · | · | active |
description
The Project forms part of the wider Workington Gateway programme, which is made up of the following elements:
- Ramsay Brow junction (A66/A596) improvement to improve access to strategic employment sites, including the Port of Workington.
- Road widening of Hall Brow (A596) to improve access to strategic employment sites, including the Port of Workington.
- Local active travel network improvements and enhanced public realm, including a new LTN1/20 compliant east-west cycle route through Hall Park running parallel and complementary to the A66, supporting proposals in the Local Cycling and Walking Infrastructure Plan (LCWIP).
- Enhancement of the cultural offer and visitor experience within Hall Park, including creation of a Social Enterprise Centre within the Walled Garden, and feature lighting of Workington Hall.
This Project will generally comprise:
⬢ Realignment and widening of the A66 Ramsay Brow/ A596 junction, allowing HGV movement from the A66 to the employment and distribution sites north of Workington.
- oA pocket park to replace the existing Henry's pub site with improved public realm, seating and a landscaped area.
- oNew toucan crossings on the eastern and southern arms of the junction.
- oNew cycle infrastructure along the A596 eastern footway between the A66 and Ladies Walk.
- oWidening of the A66 Ramsay Brow southern footway to achieve minimum 2m width throughout.
⬢ Widening of the A596 Hall Brow, allowing HGV movement from the A66 to the employment and distribution sites north of Workington.
- oFormal permit-holder only parking for the Hall Brow residents.
- oRelocated existing park boundary wall to accommodate carriageway widening.
- oNew parallel Toucan crossing for pedestrians and cyclists across the A596, connecting Black Path to the park.
The Project will be delivered in two stages:
Stage 1: Design and production of Stage 2 Works Information: Administered under NEC3 ECC Option A.
Stage 2: Construction: Administered under a separate NEC3 ECC Option A.
There will be a decision hold-point between Stage 1 and Stage 2 where the Employer may choose to proceed, or not to proceed to Stage 2.
Suppliers wishing to express an interest and obtain access to the tender documents should go to www.the-chest.org.uk and click on current opportunities from the navigation area on the left of the screen. On the next screen enter the contract Reference DN739098 in the box labelled 'contains' then click search. Click on the Blue link for the contract title to view the opportunity.
To express an interest you will need to login. If you are not already registered on the www.the-chest.org.uk you will need to return to the home page and click on Register. Register free link in the navigation area on the left of the screen. Registration is free of charge and your username and password will be emailed to you.
documents
- https://www.contractsfinder.service.gov.uk/Notice/53e4aebd-3665-4357-a9a8-03ef2250c18f , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/c787b2bb-da09-4215-9137-c35185819a5c , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
6 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 Aug 2024 | Contract notice (F02) | Earlier regulations | 026896-2024 |
| 22 Aug 2024 | Tender (tender) | · | c787b2bb-da09-4215-9137-c35185819a5c-779779 |
| 29 Aug 2024 | Corrigendum (F14) | Earlier regulations | 027538-2024 |
| 29 Aug 2024 | Tender (tender) | · | 53e4aebd-3665-4357-a9a8-03ef2250c18f-781082 |
| 9 Dec 2024 | Contract award notice (F03) | Earlier regulations | 039543-2024 |
| 9 Dec 2024 | Award (award) | · | 9d3fb2c3-f701-42c1-955b-006598a88976-809073 |
more from Cumberland Council
- Kyndryl Cloud Readiness Assessment & ICT Harmonisation · £304,229 · 3 Sept 2026
- Millom & Haverigg Flood Alleviation Project - Early Contractor Engagement · £290,000 · 21 Aug 2026
- Minor Works Framework - Kirkbride Primary School BMS Replacement and Associated Works · £45,000 · 19 Aug 2026
- Lot 1 - Handheld Hedge Trimmer · £30,000 · 18 Aug 2026
- Lot 1 - Brushcutter Trimmer · £30,000 · 18 Aug 2026
- Lot 5 Relational and Restorative Practice · £25,000 · 18 Aug 2026
- Supply of HP Pro 4 Laptops (x124) · £99,713 · 14 Aug 2026
- Minor Works Framework - Unit 16 Leconfield Industrial Estate - reroofing · £65,000 · 13 Aug 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Fire Safety Remedial Works second contract · London Borough of Haringey · £12,500,000
- Contract Award Notice - Construction Works for Petroleum Storage Depot - RAF Akrotiri · Ministry of Defence · £14,000,000
- Haringey Partnering Contracts Lot 3 EAST (north) · London Borough of Haringey · £58,928,295
- Renewable Air Source Heat Pump Installations · Lincolnshire Housing Partnership Ltd · £3,000,000
- Haringey Partnering Contracts Lot 1 WEST · London Borough of Haringey · £51,677,266
- Leisure Management Joint Venture Partner · East Hampshire District Council · £33,665,212
- CWF Lot 2A - Potgill Holme Cattle Grid Replacement · WESTMORLAND AND FURNESS COUNCIL · £60,000
- Award of DGCP-0782 - 26EED004 - Annan Academy - Toilet Block Refurbishments · Dumfries and Galloway Council · £206,731