Valley Brook Restoration Project 2023-2024
key details
| Value | £137,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45246410 |
| Region | North West |
| Deadline | 4 Sept 2023 |
| Contract start | 4 Oct 2023 |
| Contract end | 29 Mar 2024 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-e031b74b-d3b3-4309-832b-7da3d8d7e4a0 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| A E Yates Ltd. | £85,151 | 28 Sept 2023 | active |
description
(For more information, please see Guidance notes for Clients section i.) Valley Brook Restoration project must be delivered in this financial year 23/24.
Reaches 10 and 9 are the first two sections of Valley brook from Queens Park to Collins street in Crewe SJ6895355468 - SJ6942655502 and the extent is approximately a 300m section.
Valley Brook runs through the town of Crewe in Cheshire with the water course running through a highly urban setting.
Valley Brook is a very important case river to enable the developing scalable solutions for the issues of constrained and heavily modified urban water bodies which will provide learning and solutions both within GMMC and beyond.
This failing urban water body demonstrates many the pressures faced by similar water bodies. It also provides a range of demonstration potential both of a full suite of WFD mitigation measures but also delivery challenges and partnership/funding and wider benefit opportunities. Mitigation measures were identified by JBA in a report in 2019 and they were commission under the EcoSF3 framework to design a scheme that will meet these measures. Cheshire East are also installing an active travel route which will run alongside the brook in reaches 8, 7 and 6, further upstream from SJ6990155354 to SJ7024355337 and will provide funding in future years to install features for those sections too but this will be outside of this contract.
Currently, JBA have provided a detailed design to improve the biodiversity of the channel in reaches 10 and 9. It is a very sinuous channel and these features to be installed should help to bring the diversity to the channel bed.
The features for installation are as follows and section details are below:
- Riffle beds,
- Gravel bars and
- Coir Rolls
Both reaches have been developed and detailed designs have been completed.
This project will be construction only.
The EA will require a build contractor; however, they will be required to liaise with JBA to develop the design if necessary and any changes to the design will need to be approved by the EA.
The successful Contractor will carry out all works in accordance with current Legislation, industry standards and codes of practice, processes and permitting including any guidance documents.
It is anticipated that specific clause amendments will be incorporated, allocating risks associated with the foreseeable impacts of Covid-19.]
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Nov 2023 | Award (award) | · | 3dd38886-3a85-44f3-9ac8-d8089d1b8d7f-698905 |
more from Environment Agency
- Stanground 2025 · £52,235 · 11 Sept 2026
- Brentingby Penstock Spindles Replacement · £77,230 · 11 Sept 2026
- STON001 - Stony Stratford Sluice Platform and Stilling Well · £95,483 · 9 Sept 2026
- YOR - CDF - Keighley & Stockbridge OBC to FBC - ECC Contract · £96,442 · 9 Sept 2026
- AOMR Lot 2 -WMD Asset Recondition Programme 26/27 tender · £309,732 · 8 Sept 2026
- SWWM CCTV and Culvert Inspections 26_27 · £114,369 · 8 Sept 2026
- Harrimans Drive to M1 · £165,115 · 7 Sept 2026
- Forge Mill 2 · £141,827 · 7 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NW AOMR Lot 1 26/27 Direct Award Program - ESE support- Fielding Park Brook · Environment Agency · £8,895
- YNE AOMR Lot 1 Asset Reconditioning- ESH M8 - AWOC FY26-27 · defra · £98,270
- YNE AOMR Lot 1 Asset Reconditioning - ESH M7 -AWOC FY26-27 · Environment Agency · £148,086
- YNE AOMR Lot 1 Asset Reconditioning AWOC- Package C16- FY26-27 · Environment Agency · £119,082
- NEA - CDF - Skinningrove - Post-FBC Construction · Environment Agency · £7,155,986
- Central - AOMR Lot 3 Incident Response - Direct Award - 2026-27 - WMD - VMS · DEFRA · £50,000
- Central - AOMR Lot 3 Incident Response - DA - 2026-27 - WMD - Ground Control · DEFRA · £500,000
- Tilbury Docks Revetment Repairs · Defra · £2,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.