key details

Value£60,000
Statusplanned
Category (CPV) 44000000
Contract start2 Jan 2025
Contract end24 Feb 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-df66d34c-a074-42ac-a26c-73dd42d61f9e

description

To renovate Fletcher's Lea to agreed specifications including new toilet design, improvement of the bar, foyer and main room areas.

Fletcher's Lea is a multipurpose space that serves high end guests attending weddings, celebrations and conferences but also provides a setting for a variety of events for the community of Ware. The aspiration is to improve the current facilities so that it is desirable to all clientele whilst being functional and efficient for every use.

In general access to Fletcher's Lea will be Monday to Friday from 8am until 8pm. If work is required to be undertaken over the weekend, this can be arranged with the Sales and Operations Manager.

Ware Priory is operational with commercial and charity events at various times. Coordination with the Sales and Operations Manager will be required as it may be necessary that no work is carried out should it be deemed to cause disruption to private events on the Priory estate.

Detailed Specification of Fletcher's Lea Internal Refurbishment Project

Toilets

Update to modern specification on a like for like basis
Possibility of reducing ladies stalls from 4 to 3....
Replace the current stalls and white goods in line with the toilets in the main Ware Priory building
Replace the appointments (soap dispensers, dryers etc) as per above.

Essential Sustainability Work

  • The addition of hot water distribution taps in toilets, kitchen and bar to reduce all taps to 5.7 litres/minute. This will reduce HW demand and ASHP size plus meet ESG directives.
  • The installation of a Hot Water Cylinder Heat Pump. Switch the direct electric hot water system to a hot water cylinder heat pump such as the Dimplex EDL or Daikin Altherma with SCOP min 2.7. This then provides renewable hot water. Short ductwork needed to external wall/roof.

Main Room

To submit a design for a multi-purpose facility including items below
Wall Spaces - add mirror in large space on the right hand side as you enter the room
Provide choice of vinyl rendering for the storage / door panelling to match the bar area
Replacement of curtains with black out curtains or blinds to suit the design element.

Reception

Repaint or stylish vinyl covering or bar panelling - to match with main room storage doors (see above)
Area Between Bar Corridor and Foyer
Replace shelf with something more durable
Box in area below
Splash backs for area above
Clean up sink

Kitchen

Removal of excess equipment including safe and current storage units
To be replaced with closed in cupboard storage
Wall space needs redecorating and plastic cornering added to protect from scuffing
Replacement of gas hob for electric one.

Bar

New design and some functional improvements including:-
Mirrored back walls
Silver / chrome shelving above fridges
Re-decorate flooring and lower wall area by the glass washer and sinks.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
31 Oct 2024 Planning (planning) · 164912f9-209e-42e5-8a86-0cf4a709971d-798921

more from Ware Town Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.