Thames Tideway Tunnel - C405 Main Works West - Temporary Tunnel Lighting copy

key details

Value£50,000
Statusactive
Category (CPV) 03419100 +1 more
RegionLondon
Deadline24 Jul 2018
Contract start6 Aug 2018
Contract end28 Feb 2019
SME suitableNo
OCIDocds-b5fd17-d33d5f8c-5706-4004-bd3c-922449a2e82d

description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

The Main Works West - Contract 405: all works from and including the Acton Storm Tanks shaft to and including the Carnwath Road Riverside shaft, as well as the Frogmore connection tunnel from Carnwath Road Riverside shaft to King George's Park shaft.

This works package is for the supply and delivery to site of Timber packers TTT West,

Supply of the following:-

15500 No D40 timbers 100mm X 100mm X 1300mm

Delivered to Morgan Sindalls RIDHAM Precast Facility (NOT Carnwath Road).

Ridham Precast Ridham Dock, Sittingbourne ME9 8SR

Current Programme

4000 Timbers required to transport 500 rings from Ridham starts 6th August 2018 8000 Timbers required to transport 1000 rings from Ridham starts 19th September 2018 3500 Timbers required for full production deliveries Ridham Feb 2019

I'm not sure at this time if each of the three deliveries will be a lump sum delivery or a certain amount per day until the total has been reached.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

Cost

Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
20 Jul 2018 Tender (tender) · 2aac1f11-0bb1-48f2-94fe-64a322f5221e-230040

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.