gvtcx

Quantity Surveyor Services- ULHT Trust Wide Water Infrastructure Programme

United Lincolnshire Hospitals NHS Trust Published 10 Sept 2020 Contracts Finder

key details

Value£1,400,000
Statuscomplete
Category (CPV) 71324000
RegionEast Midlands
Deadline26 Aug 2020
Contract start29 Nov 2020
Contract end31 Mar 2021
Procedureselective
SME suitableNo
OCIDocds-b5fd17-d103a747-a847-4fed-afed-014dd7f4a573

Award

SupplierValueDateStatus
Quadrant Surveying LTD £11,440 6 Sept 2020 active

description

United Lincolnshire Hospitals Trust seeks to appoint a Quantity Surveyor to be part of an Engineering Lead Consultants Design team to provide high level costs of the proposed option. This will allow the costings to be submitted into the OBC to be presented to the Trust Board and also to full completion of the scheme to support the delivery of the United Lincolnshire Hospitals NHS Trust Wide Water Infrastructure Programme. The Engineering Lead Design team will work closely with Consultant Services for designing sanitary accommodation modifications/ decommissioning of sanitary accommodation and turning rooms into fire compliant storage rooms.

The Authority has estimated this project across all three Trust Sites, Lincoln Hospital £600K, Boston Pilgrim Hospital £500K and Grantham Hospital £200K and requires the Consultants Design Team to take the Trusts water risk assessment outputs and convert these into a quantified schedule and specification of works forming part of the works tender packages, provide professional input into the contractor evaluation and selection process and fully co-ordinate and contract administer the works on site to practical completion and through defects liability periods.

There are known backlog and CIR water issues which also require further attention ex DHW Generation and Distribution at Grantham, DHW Generation and Distribution at Pilgrim, Lincoln County Mat wing DHW distribution, cold water supply to the mat wing will require assessment and further investigation for pipe condition/ insulation and condition. All CIR/ Backlog expenditure and physical remediation works are to be completed by 31 March 2021. All Water Risk Assessments and Schematics for each Trust site and block will be included.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 Sept 2020 Award (award) · a2429a7c-44f2-4290-873b-a00b11cc5fb9-380593

more from United Lincolnshire Hospitals NHS Trust

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.