International Energy Agency (IEA) Annex 42 Heat Pumps in Smart Grids
key details
| Value | £15,800 |
|---|---|
| Status | complete |
| Category (CPV) | 73000000 |
| Deadline | 16 Sept 2013 |
| Contract start | 29 Oct 2013 |
| Contract end | 30 Sept 2017 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-be6a1a28-adc9-11e6-9901-0019b9f3037b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Delta Energy and Environment Limited | £15,800 | 30 Mar 2016 | active |
description
The Heat Strategy puts heat pumps at the forefront of our long term ambition to decarbonise the heat sector through a greater proportion of electrified heating systems within an increasingly low carbon grid.
This electrification of heat energy will have a major impact on not only the capacity required by the grid but also the ability to respond and manage large peaks in electricity demand during cold spells when there is a large heating demand.
The deployment of smarter grid systems and technologies will therefore be vital in managing these peaks and in the case of heat pumps the potential to shift some of the electricity demand from peak periods could be valuable for future electricity networks and markets.
The International Energy Agency (IEA) runs more than 40 multilateral technology initiatives (also referred to as Implementing Agreements), covering the entire spectrum of energy policy. This project will contribute to IEA Annex 42 – Heat pumps in smart grids as part of the Implementing Agreement on Heat Pumps.
DECC requires a contractor to deliver the research for this Annex, to attend the relevant IEA meetings and to report their findings to DECC, the UK heat pump industry and the IEA.
The aims of the study are to critically evaluate past literature and current field trials to evaluate the evidence for methods to shift peak demand with a heat pump system and to collate this research, and that from other Annex partners, to develop standardised solutions for different domestic archetypes to facilitate heat pump systems that are capable of avoiding peak electricity periods.
This requirement was originally fulfilled for the period 29 October 2013 to 31 March 2016. A contract variation was put in place for the period 1 April 2016 to 30 September 2017. The original contract price was £34,350. It was extended by £15,800. Although the contract period and the tasks have increased there is no change to the original scope of the work.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Award (award) | · | 91346928-e6c1-4243-93a2-ba3d0a638d95-98761 |
more from DEPARTMENT OF ENERGY AND CLIMATE CHANGE
- Assessing the cost reduction potential and competiveness of novel (next generation) UK carbon capture technology (contract extension) · £75,000 · 27 Mar 2017
- Project to produce an overview document and assist a Quality Assurance (QA) scoping study for the National Atmospheric Emissions Inventory (NAEI) models · £20,000 · 14 Feb 2017
- Technical expertise in social research application to low cost, low carbon homes research project · £21,700 · 14 Feb 2017
- CONTRACT FOR THE PROVISION OF EMERGENCY RESPONSE TRAINING TO THE DEPARTMENT FOR BUSINESS, ENERGY AND INDUSTRIAL STRATEGY · £282,924 · 23 Jan 2017
- CO2 transport and storage: Review of business models (Phase 1) · £20,000 · 19 Dec 2016
- Cavity Party Wall Insulation: Measuring U-values · £291,913 · 19 Dec 2016
- Additional Verification of the NAEI shipping model · £10,920 · 30 Nov 2016
- Heat Network Electricity Revenue Guidance · £50,000 · 22 Nov 2016
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ACAS27482 - MH Good Practice tender · UK SHARED BUSINESS SERVICES LIMITED · £69,730
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Award of Effective ventilation guidance and practice to mitigate the indoor airborne transmission... · Scottish Government · £9,826
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.