Monkton Terrace Footbridge Parapet Replacement and General Maintenance

South Tyneside Council Published 19 Apr 2023 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£396,660
Statuscomplete
Category (CPV) 45221100
RegionNorth East
Deadline20 Sept 2022
Contract start17 Apr 2023
Contract end18 Sept 2023
Procedureselective
SME suitableYes
OCIDocds-b5fd17-ab297c8f-36da-47bb-b537-7d628ab456ca

Award

SupplierValueDateStatus
MELDRUM CONSTRUCTION SERVICES LIMITED £396,660 30 Mar 2023 active

description

The Monkton Terrace Footbridges were constructed in circa 1974. They comprise two separate structures supporting public footpaths. Each bridge sits either side of the Network Rail bridge (masonry arch) which carries the main carriageway of Monkton Terrace.

The structures carry pedestrians and cyclists over two railway lines. The northern line is owned by Network Rail and carries goods traffic to and from the Shell Oil Refinery in Jarrow. The southern line is owned by Nexus Rail and forms part of the Pelaw to South Shields branch of the Tyne and Wear Metro.

Initial works

The following remedial works are proposed prior to commencing works on the East footbridge:

oErect pedestrian diversion signs
oPrepare the site compound and secure the site
oEnsure that Nexus Metro rail possession and permits are in place

Main works

The following remedial works are proposed for both of the footbridges:

Install rail protection measures to the footbridge.
Removal of existing parapets and cutting down of the sockets to below the surface of the existing reinforced concrete plinth.
Treating and repair of the voids within the concrete plinth, created from the removal of the parapet.
Extension of the existing concrete plinth (from 200mm to 300mm) to accommodate the new parapet connection details.
Installation of new surface mounted parapets, to both footbridges, which will be drilled and bolted down into the extended reinforced concrete upstand.
The deck waterproofing system, joints and surfacing will also be replaced and repaired as part of these works.
Miscellaneous maintenance repairs.
The works are to be undertaken following the installation of edge protection, which will be undertaken during overnight possessions of the Nexus Rail lines. Further possessions will be required for:
othe re-pointing of the existing abutments and the removal of the edge protection.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
19 Apr 2023 Award (award) · af0d0447-ad3a-49a2-acaa-10805e991987-637398

more from South Tyneside Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.