Demolition Services M3J9
key details
| Value | £325,000 |
|---|---|
| Status | active |
| Category (CPV) | 45000000 |
| Region | South East, South West |
| Deadline | 19 Sept 2025 |
| Contract start | 1 Aug 2026 |
| Contract end | 1 Oct 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-91cc8110-538e-44b4-a5ef-4bed96cd3204 |
description
The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North.
Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety.
The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions.
The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and around the junction for both pedestrians and cyclists.
Other construction works include but not limited to
the following:
-2no. underpasses for the M3 mainline and A34 Northbound
-1no. pedestrian subway
-9no. MS4s, 1no. long span and 1no. portal gantries
-Footbridge over the River Itchen
-6no. locations for sheet piling locations and 1no. for blockwork retaining wall -Site wide motorway communications installation
-Site wide vehicle restraint barrier installation
The scope is for general demolition works on the M3J9.
documents
- https://www.contractsfinder.service.gov.uk/Notice/29b43a00-23ae-47de-8934-36e39f325690 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Sept 2025 | Tender (tender) | · | 29b43a00-23ae-47de-8934-36e39f325690-862713 |
more from BALFOUR BEATTY CIVIL ENGINEERING LIMITED
- Balfour Beatty - Roads North of the Thames-LTC - Concrete & Polymer Reinforced Crib Walls · £1,000,000 · 17 Aug 2026
- Balfour Beatty - Roads North of the Thames-LTC - Technology & Lighting Surveys · £50,000 · 3 Aug 2026
- A66 - Access and Haul roads · £100,000 · 22 Jul 2026
- A66 - Works Examiner · £500,000 · 22 Jul 2026
- A66 - Security package · 2 Jun 2026
- Balfour Beatty - Roads North of the Thames-LTC - Sheet Pile Walls · £1,500,000 · 21 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Reinforced Soil Walls · £2,500,000 · 13 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Pavement Survey Works · £50,000 · 13 Mar 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- 12694 - Stalybridge Multi Storey Car Park · Tameside Metropolitan Borough Council · £5,000,000
- 20266 - Proposed Single Storey Rear Bedroom and Shower Room Extension at 29 Elworthy Avenue, Halewood L26 7AA · Knowsley Council · £80,000
- Derby City Council - Bute Walk · WESTWORKS PROCUREMENT LIMITED · £1,081,059
- 20264 - Proposed Single Storey Rear WC Extension at 28 Mirfield Close Halewood L26 9XP · Knowsley Council · £50,000
- 20261 - Proposed Single Storey Rear Bedroom Extension at 6 Fleetwood Gardens, Kirkby, L33 1TP · Knowsley Council · £50,000
- 12692 - Proposed Single Storey Rear / Side Bedroom and Shower Room Extension at 35 Elizabeth Road, L10 4XJ · Knowsley Council · £80,000
- 12691 - Proposed Single Storey Side / Rear Bedroom and Shower Room Extension at 103 Bearwood Road, L33 2AF · Knowsley Council · £80,000
- SCC - KC - St. Martins CoE Demountable Classrooms · SURREY COUNTY COUNCIL · ·
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.