M3J9 Sprayed Concrete
key details
| Value | £850,000 |
|---|---|
| Status | active |
| Category (CPV) | 44000000 |
| Region | South East, South West |
| Deadline | 19 Sept 2025 |
| Contract start | 16 Sept 2026 |
| Contract end | 2 Mar 2027 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-82f7eac0-100b-4928-9f57-556d0ff5b2d7 |
description
The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North.
Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety.
The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions.
The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and around the junction for both pedestrians and cyclists.
Other construction works include but not limited to
the following:
-2no. underpasses for the M3 mainline and A34 Northbound
-1no. pedestrian subway
-9no. MS4s, 1no. long span and 1no. portal gantries
-Footbridge over the River Itchen
-6no. locations for sheet piling locations and 1no. for blockwork retaining wall -Site wide motorway communications installation
-Site wide vehicle restraint barrier installation
The scope of the works required are for the delivery, Installation, material provision and testing of the Sprayed Concrete for the underpasses on the M3J9 Improvement Scheme.
documents
- https://www.contractsfinder.service.gov.uk/Notice/86714978-5642-49a6-93f0-42f48b882da1 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Sept 2025 | Tender (tender) | · | 86714978-5642-49a6-93f0-42f48b882da1-862699 |
more from BALFOUR BEATTY CIVIL ENGINEERING LIMITED
- A66 - Access and Haul roads · £100,000 · 22 Jul 2026
- A66 - Works Examiner · £500,000 · 22 Jul 2026
- A66 - Security package · 2 Jun 2026
- Balfour Beatty - Roads North of the Thames-LTC - Sheet Pile Walls · £1,500,000 · 21 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Reinforced Soil Walls · £2,500,000 · 13 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Pavement Survey Works · £50,000 · 13 Mar 2026
- Balfour Beatty - Roads North of the Thames-LTC - Demolition Works · £100,000 · 23 Feb 2026
- A66 - FRC · £5,000 · 20 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ** Mini Competition ** George Stephenson High Water Main Replacement Phase 3 PRF 21-070 · NORTH TYNESIDE COUNCIL · £122,000
- **Mini Competition** Burradon primary School Heating Boiler Replacement · NORTH TYNESIDE COUNCIL · £122,000
- ** Direct Award ** Marden Estate Phases 1 & 2 - Roof Replacements · NORTH TYNESIDE COUNCIL · £1,430,000
- **Direct Award** Marden Estate Phases 1 & 2 - Scaffolding for Roof Replacements · NORTH TYNESIDE COUNCIL · £389,000
- C005PC St Botolph's Circus · Essex County Council · £7,185,203
- **Direct Award** - Backworth, Holystone & Castle Park - Kitchen and Bathroom Installations · NORTH TYNESIDE COUNCIL · £616,000
- RA357559 - Maintenance for mortuary equipment · University Hospitals of Derby and Burton NHS Foundation Trust
- PR062025 - Fire Compartmentation & Fire Door Works · Exeter City Council · £1,458,804
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.