gvtcx

Thermoplastic Road Markings Framework

Blackburn with Darwen Borough Council Published 5 Dec 2024 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£200,000
Statuscomplete
Category (CPV) 45233140 +2 more
Deadline13 Jan 2025
Contract start1 Apr 2025
Contract end31 Mar 2027
Procedureopen
SME suitableYes
OCIDocds-b5fd17-766c7aba-062e-4dd1-80bd-5b092eae1815

Awards (2)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is £200,000.

SupplierValueDateStatus
Premier RoadMarkings Limited shared £80,000 10 Feb 2025 active
WJ North Limited shared £80,000 10 Feb 2025 active

description

Blackburn with Darwen Borough Council looks after a large range of highways and non-highway areas in various stages of repair and maintenance. Blackburn with Darwen has a unique environment and economy, which presents specific challenges to delivery of surfacing and civils schemes.

In addition, a significant investment programme in the town is leading to increased demand for new highways, changes to layouts and modern surface finishes.

The council has In house operational teams that carry out or supervise a variety of highway maintenance works across the borough. Maintaining the safety of the public and the Council's staff is a key consideration in delivering these works. Often these works require no provision of thermoplastic road markings. However, some of the works require replacement/renewal/removal of thermoplastic road markings that require equipment not held by the Council. In these circumstances, external contractors are procured to carry out these works.

Some of this work will be regular, planned, routine and other work will be part of larger schemes.

Works should normally be carried out within 10 working days of receipt of the instruction from the council's Clients Representative, or his authorised officer.

However, there will be a requirement to provide thermoplastic road markings within a reduced timescale.

The majority of the work required will take place on highway authority roads with speed limits up to 50mph; however contractors shall be competent to work on high speed roads up to 70mph when required.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
5 Dec 2024 Tender (tender) · 34c7353d-0048-4b77-9cd3-15938c45a858-808426
27 Mar 2025 Award (award) · 5f3dad0e-fa40-45c6-a29f-3fbcab7d9b60-836861

more from Blackburn with Darwen Borough Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.