Central Substation RIBA4 & Build
key details
| Value | £1,300,000 |
|---|---|
| Status | active |
| Category (CPV) | 45000000 +3 more |
| Deadline | 27 Mar 2026 |
| Contract start | 28 Mar 2026 |
| Contract end | 29 Mar 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-6273252d-96a7-413c-ad97-3ea3cf17323b |
description
The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.
documents
- https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=103172&B=KBS
- https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/153032
- https://www.contractsfinder.service.gov.uk/Notice/3001bab6-7d96-4385-bc96-45eda0d78114 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 25 Feb 2026 | Tender (tender) | · | 3001bab6-7d96-4385-bc96-45eda0d78114-885802 |
more from KBS Maritime Ltd
- BLD-3163 Store 54 Independent Heating Solution - Delivery · £1,000,000 · 18 Aug 2026
- Modular Building Construction · £1,000,000 · 24 Jun 2026
- ATEX Remedials · £200,000 · 22 Jun 2026
- Cable Management System · £1,000,000 · 17 Jun 2026
- Rotary Frequency Converter · £2,000,000 · 8 Jun 2026
- Building Rewire Projects · £1,000,000 · 8 Jun 2026
- 60Hz Transformer Purchase · £250,000 · 4 Jun 2026
- B Lock Penstocks Replacement · £5,000,000 · 20 May 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- CBC-1682-FA-LS-FC-65-ZH 5 Richard Street - AWARD · Central Bedfordshire Council · £13,638
- 12694 - Stalybridge Multi Storey Car Park · Tameside Metropolitan Borough Council · £5,000,000
- 20266 - Proposed Single Storey Rear Bedroom and Shower Room Extension at 29 Elworthy Avenue, Halewood L26 7AA · Knowsley Council · £80,000
- Derby City Council - Bute Walk · WESTWORKS PROCUREMENT LIMITED · £1,081,059
- 20264 - Proposed Single Storey Rear WC Extension at 28 Mirfield Close Halewood L26 9XP · Knowsley Council · £50,000
- 20261 - Proposed Single Storey Rear Bedroom Extension at 6 Fleetwood Gardens, Kirkby, L33 1TP · Knowsley Council · £50,000
- 12692 - Proposed Single Storey Rear / Side Bedroom and Shower Room Extension at 35 Elizabeth Road, L10 4XJ · Knowsley Council · £80,000
- 12691 - Proposed Single Storey Side / Rear Bedroom and Shower Room Extension at 103 Bearwood Road, L33 2AF · Knowsley Council · £80,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.