WASHWOOD HEATH DEPOT & NETWORK INTEGRATED CONTROL CENTRE FOR HS2 Limited
key details
| Value | £275,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 34946000 +4 more |
| Region | West Midlands |
| Deadline | 31 Mar 2021 |
| Contract start | 15 Mar 2023 |
| Contract end | 14 Mar 2028 |
| SME suitable | No |
| OCID | ocds-b5fd17-5ac62baa-7a9e-466e-aea9-e95e26f4bbca |
description
The WWH&NICC Contractor will be responsible for the design, fabrication, assembly, supply, construction, installation, supervision, inspection, testing, system commissioning and safety authorisation of a rolling stock depot and the design, build and commissioning of a Network Integrated Control Centre at Washwood Heath in Birmingham (including maintenance of all the works up to their completion). The Washwood Heath Depot will be the single rolling stock maintenance and servicing facility for HS2 Phase One.
The scope is further detailed in the PQQ pack and Contract Notice but includes:
| - | A maintenance building located within the depot - building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, welfare and domestic provisions, building security and a building management system. The maintenance building will contain light and heavy maintenance plant and equipment facilities (gantry cranes, mono rail cranes, access gantries, access pits, inspection and maintenance roads, heavy cleaning facility, heavy lift and bogie drop facilities, depot offices, depot control centre, pantograph test facility, biohazard facility, building management system and workshop and storage areas etc); |
| - | Depot infrastructure including: reception/departure roads, track/permanent way, test track, switches & crossings, overhead catenary system, stabling/cleaning sidings, depot signalling system, depot protection system, telecoms system, automatic vehicle inspection units, wheel lathe(s), carriage wash machines, toilet emptying facilities, platforms, walkways, train crew booking facilities and a separate heavy cleaning facility. Provision of non-traction High Voltage and Low Voltage power network for all plant, equipment and buildings and all Protection & Controls and Supervisory Control and Data Acquisition associated with the traction and non-traction switchgear. Provision of all mechanical and electrical systems throughout the depot and associated buildings; |
| - | A Network Integrated Control Centre building located within the depot area, including building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, operational and incident control rooms, training and IT systems room, offices, ancillary rooms, welfare and domestic provisions, building services, building security and a building management system; |
| - | Car parking facilities, gatehouse, site security and lighting within the depot area and the provision of site drainage and all utilities related to the depot and connections to the main utility networks; |
| - | Design integration with the other HS2 Ltd contractors (Rail Systems, Civils, Rolling Stock and the Depot Facility Owner (DFO)); |
documents
- https://hs2.bravosolution.co.uk , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/cc407c63-c505-4d09-ab05-ebdbbf797f1f , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Feb 2021 | Tender (tender) | · | cc407c63-c505-4d09-ab05-ebdbbf797f1f-413597 |
more from HS2
- Contracts for Automated People Mover (APM) System · £270,000,000 · 11 Mar 2026
- ABANDONED - HS2 Supply of Fleet of On-Track Machines Procurement · £123,950,617 · 5 Feb 2026
- ABANDONED - Green Assets Maintenance & Management Procurement · £209,408,000 · 22 Dec 2025
- ABANDONED - Phase One and Phase Two Stations Platform Edge Doors Framework Agreement · £93,000,000 · 31 Jul 2025
- LAN WIFI & SD-WAN Managed Services · £263,176 · 29 Jul 2025
- Commercial Assurance Services 2025 · £651,600 · 31 Mar 2025
- Stakeholder mapping and engagement to support HS2 Reset communications and engagement · £22,700 · 21 Mar 2025
- Counter Fraud and Business Ethics (CFBE) Expert Services · £76,400 · 18 Mar 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- London Trams' Depot and Infrastructure Project · Transport for London · £3,800,000
- Supply of Long and Short Rail and Ancillary Services · Network Rail Infrastructure Ltd
- GCRE Purchase of Bulk Materials for Phase 1A Sidings · GCRE Ltd
- Supply of 'Green' Steel Rail Trial · Network Rail Infrastructure Ltd
- Practice Rail Track Supply and Installation · London Borough of Merton · £40,000
- Walkway and Drainage Panels · Transport for London · £2,702,658
- Subway Track Furniture Components · Strathclyde Partnership for Transport (UTILITIES)
- Port Enterprise Zone Rail Works · Sunderland City Council · £594,673
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.