CPSP 144 A12 to A120 Widening - DIP estimate review, A66 NTP - Stage 3 Estimate, M3 J9 - VE Works, RIS3 Pipeline Inflation & HS2 - M6

Highways England Published 29 Mar 2021 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£65,452
Statuscomplete
Category (CPV) 71244000
Deadline26 Feb 2021
Contract start8 Mar 2021
Contract end31 Mar 2021
Procedureselective
SME suitableYes
OCIDocds-b5fd17-4b59fc11-c57c-42a5-a9dc-6bdf1ccf3a48

Award

SupplierValueDateStatus
Benchmark Estimating £65,452 8 Mar 2021 active

description

A12 to A120 Widening - DIP estimate review

Following the latest revision of the cost estimate and draft DIP budget, the DIP have submitted a budget that is in excess of the available funds. The project team have been asked Cost Planning to review the submission prepared by the DIP to understand where the differences lie. Initially there will be check of the reference data to ensure that there is consistency between the two estimates. Further involvement by the CPSP on the estimate checks/reviews will be instructed by the Estimating Manager. Attendance and participation at project team meetings is requested of the CPSP to complete this works. Follow on work is likely to be required also under this request.

A66 NTP - Stage 3 Estimate

Scope is likely to exceed that of a standard Developing Estimate given it is a Tier 1 scheme. This will likely involved additional outputs being produced for the project team as well as more attendance at internal meetings.

M3 J9 - VE Works

Following the latest revision of the cost estimate and draft DIP budget, the DIP have submitted a budget that is in excess of the available funds. The project team, along with the DIP have been asked to explore whether there are any value engineering opportunities in the scheme's design. Attendance and participation is requested of the CPSP to complete this works. Follow on work is likely to be required also under this request.

RIS3 Pipeline Inflation

-Using the an updated inflation profile to be provided by Highways England, re-calculate the value of inflation across all schemes within the RIS 3 portfolio
-Approach to be assured by Highways England before release to HoCP
-Table outputs and report them back to the HoCP

HS2 - M6 J15

-Provide the HS2 team with some high-level costs of construction for two proposed layouts to Junction 15 on the M6
-Outputs are required within a 2-week timescale
-Due to this compressed deadline, it was agreed that only the cost of construction comprising; direct works, indirect works, unscheduled item allowance and contractor fee, would be produced for this request.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
29 Mar 2021 Award (award) · 7792755d-70c0-476a-8fcb-6913d6a56dfe-424212

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.