gvtcx

Tender Round 7 (TR7) for the grant of two offshore transmission licences

Office of Gas and Electricity Markets Published 30 Nov 2020 Contracts Finder

key details

Value£1,325,000,000
Statusactive
Category (CPV) 65300000
RegionEast of England, Scotland
Deadline5 Feb 2021
Contract start6 Apr 2022
Contract end5 Apr 2047
Procedureselective
SME suitableNo
OCIDocds-b5fd17-4892a048-cb0c-4220-8810-ae8634cb0dfa

description

This concerns the proposed grant of two offshore transmission licences to successful bidders to connect three offshore wind farms to the GB onshore grid.

TR7 consists of Triton Knoll Offshore Wind Farm and Moray East Offshore Wind Farm (the Projects).

The tender process will consist of two stages for each Project: an Enhanced Pre-Qualification (EPQ) stage and an Invitation to Tender (ITT) stage, resulting in selection of preferred bidders.

Any bidder wishing to participate in the EPQ stage for any Project must express their interest as per the requirements in the EPQ documentation.

Additional information:

TR7 consists of Triton Knoll Offshore Wind Farm and Moray East Offshore Wind Farm (the Projects).

The tender process will consist of two stages for each of the Projects: an Enhanced Pre-Qualification (EPQ) stage followed by an Invitation to Tender (ITT) stage which will result in the selection of a preferred bidder.

Any bidder wishing to participate in the EPQ stage for any or all of the Projects must express interest in doing so in accordance with the requirements in the EPQ documentation.

The type of procedure to be adopted is a competitive procedure with negotiation. The subject matter of this notice is the proposed grant of two offshore transmission licences to successful bidders for the purpose of connecting two wind farms to the GB onshore grid.

TR7 consists of two projects. A transmission licence is expected to be granted for each project. High level details about the projects are as follows:

Project: Triton Knoll Offshore Wind Farm; Developer: RWE Renewables, J-Power and Kansai; Limited Capacity (MW): 857; Location: Within the Greater Wash, approximately 20 miles off the coast of Lincolnshire and 28 miles from the coast of north Norfolk

Project: Moray East Offshore Wind Farm; Developer: Diamond Green Limited, Moray Offshore Renewable Power Limited, Delphis Holdings Limited and China Three Gorges Limited; Limited Capacity (MW): 900; Location: Approximately 22km off the Caithness coastline in Northern Scotland

Requests to participate/EPQ submissions must be made electronically by 12:00 (local time), 05/02/2021 See the above links for how to do this.

Please note that the information contained in the fields 'contract start date', 'Contract end date' and 'Lowest/actual value (£)' in section 1 of this notice are indicative only. Please consult the tender documentation for further details.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Feb 2021 Tender amendment (tenderAmendment) · a08f7a96-8875-4c6d-bed9-28964b49d192-415273

more from Office of Gas and Electricity Markets

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.