Blade Leading Edge Erosion Program (BLEEP) - Numerical Modelling
key details
| Value | £35,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73000000 |
| Deadline | 29 Apr 2015 |
| Contract start | 18 May 2015 |
| Contract end | 20 Jul 2015 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-47cb8b3f-adc8-11e6-9901-0019b9f3037b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Frazer Nash Consultancy Ltd | £32,501 | 31 May 2015 | active |
description
In response to the growing concerns over blade leading edge erosion and its impact on the operational performance and asset integrity of offshore wind farms, the ORE Catapult has commissioned BLEEP (Blade Leading Edge Erosion Programme). The programme consists of four (4) distinct work packages (WP) that will provide knowledge, infrastructure, products and technical expertise to reduce the levelised cost of energy impact of LEE.
The objective of this procurement exercise is to secure numerical modelling expertise to support the pilot study.
Numerical modelling approaches are required to investigate the effect of changes in the rig design and operation (e.g. arm length/shape, sample size/shape, tip speed, containment) on the impact characteristics of the water droplets striking the test sample (parameter study). The pilot test rig will be limited in size and functionality; given that the final ORE Catapult rig is expected to be larger in design, numerical modelling is regarded as a suitable approach to explore changes in the various design parameters out with the functionality of the pilot rig.
In addition, numerical modelling is required to investigate the impact characteristics of rain droplets striking the leading edges of operational offshore wind turbines (e.g. velocity, angle, location and strike rate at location) and how to replicate these in a whirling arm rain erosion test rig (real world conditions study). Note – this may require use of the test rig model developed for the parameter study.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 2 Apr 2015 | Award (award) | · | ocds-b5fd17-47cb8b3f-adc8-11e6-9901-0019b9f3037b-62115-ore-15-27 |
more from OFFSHORE RENEWABLE ENERGY CATAPULT
- Board Review · £44,000 · 21 Jun 2023
- Ansys Software Agreement · £373,103 · 20 Jun 2023
- Technology Qualification & Development Programme - Bend Stiffener Connectors - Stage 1 2013 · £115,000 · 11 May 2023
- 02962837 · £35,240 · 18 Apr 2023
- ORE/22/077 - Lifecycle Assessment Methodology for Carbon Emissions in Offshore Wind · £59,000 · 18 Apr 2023
- Hubspot PDS System · £33,480 · 28 Mar 2023
- FLOWIC Test Rig Definition · £59,600 · 28 Mar 2023
- Guide to a Floating Offshore Wind Farm · 27 Apr 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ACAS27482 - MH Good Practice tender · UK SHARED BUSINESS SERVICES LIMITED · £69,730
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Award of Effective ventilation guidance and practice to mitigate the indoor airborne transmission... · Scottish Government · £9,826
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.