BBV HS2 MWCC North - Deep Drainage - Micro Tunnelling (WP/CM)

BIP SOLUTIONS LIMITED Published 1 Apr 2021 Contracts Finder

key details

Value£1
Statuscomplete
Category (CPV) 43120000 +3 more
RegionWest Midlands
Deadline8 Apr 2021
Contract start28 Jul 2021
Contract end31 Mar 2022
Procedureopen
SME suitableNo
OCIDocds-b5fd17-44b3d466-146e-45c0-9c05-38fef88ff978

Award

SupplierValueDateStatus
Active Tunnelling Ltd £3,794,566 23 Nov 2021 active

description

Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2.

We are looking to engage with the supply chain whom provide Deep Drainage/ Micro Tunnelling works.

This package of works includes two pipeline runs to be installed. The two pipes are different in diameter, one being 600mm & the other is a 1500 mm.

The length of 1500 mm pipe featured is approximately 1190 metres. The peak depth of the install features at 11.90 metres BGL.

A 600 mm pipe is also featured and this will also convey waters between the Marston Lane inlet, to an outlet planned at the rear of the Kingsbury Compound settlement pond.

Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
22 Dec 2022 Award (award) · 34985aab-14aa-4928-a62d-3718c1020d04-600442

more from BIP SOLUTIONS LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.