SMARTLINE Project - Sensor Installation, Maintenance and Removal
key details
| Status | complete |
|---|---|
| Category (CPV) | 45300000 +6 more |
| Region | South West |
| Deadline | 7 Aug 2017 |
| Contract start | 8 Aug 2017 |
| Contract end | 9 Aug 2017 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-5fb454fb-3807-46e7-b616-654614c6bcc7 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Blue Flame (Cornwall) Ltd | £192,115 | 17 Aug 2017 | active |
description
Scope of Work
| 14. | This tender consists of |
| 14.1. | Becoming familiar with the installation requirements of the sensors / gateways |
| 14.2. | Arranging installation appointments following the standard Coastline Housing process described in sections above |
| 14.3. | Receiving, physically checking and managing stocks of pre-configured / labelled sensors |
| 14.4. | Installing sensors, gateways and other devices in homes |
| 14.5. | Ensuring the specified connectivity back to the Data Collection System is in place |
| 14.6. | Confirming that the sensors are communicating with the Data Collection System and data is being collected, using the system provided. |
| 14.7. | Re-visit houses during the maintenance period to maintain / replace equipment (including making the appointments with residents) in line with the Maintenance SLA requirements set out below. |
| 14.8. | De-install all equipment by the end of the project period. This may be on an 'as required' basis if home decided to withdraw from the project and/or at the end of the 2 year data collection period (see Project Timescale section) |
| 14.9. | Maintain and communicate accurate records of all contacts with residents |
| 14.10. | Maintain and communicate accurate records of all sensors, gateways and other equipment installed, maintained and de-installed. |
| 14.11. | Collate equipment de-installed and handover to the project team at the end of the project |
| 14.12. | Report on a monthly basis |
| 14.13. | Produce an end-of-project report |
documents
- https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=20834&B=EXETER , tenderNotice
- https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/53042 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/575bed5b-a349-4d0e-9638-bb3ed0d32bb4 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 6 Jul 2017 | Tender (tender) | · | 575bed5b-a349-4d0e-9638-bb3ed0d32bb4-158730 |
| 12 Nov 2017 | Award (award) | · | a0ea6254-5a9e-4cf1-a245-52facd916673-181512 |
more from University of Exeter
- Fuel Cards · 19 Feb 2026
- Supply of Cleaning Chemicals · £168,576 · 23 Jan 2026
- Infrared Lenses · £14,560 · 26 Nov 2025
- FCP: LEEP NEV - Climate Resilience of Agricultural Production and Farm Business · 18 Sept 2025
- Legal Services Framework · £1,500,000 · 14 Jul 2025
- Grism Wheels · £24,500 · 20 Mar 2025
- Provision of Paper for Graduation Certificates & Transcripts · 20 Feb 2025
- Roscrow Wind Turbine Supply · 7 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- 12 Kirby Road; Phase 2 - Internal conversion and fit-out of guesthouse to two 4-bedroom maisonettes. £15k - £400k BHC Building and Refurbishment Framework · Blackpool Council · £217,507
- Lincoln College Loft Insulation - Abbey Building, Friary Building and Temple Building · Lincoln College Group
- Refurbishment Works Lot 3 Blandford Fire Station · Dorset & Wiltshire Fire and Rescue Authority · £878,102
- Domestic Energy Retrofit Works - FAT Notice · Cheshire East Borough Council · £207,500,000
- PP-10183b Hornchurch Academy Trust Construction, Infrastructure, Building Works, Installations and Renewables Open Framework · HORNCHURCH ACADEMY TRUST · £830,000,000
- Barnet Homes Aids and Adaptations Works Contract · Barnet Homes Ltd · £4,000,000
- Replacement and Upgrade of Kitchens 2026 - 2031 · Bolsover District Council · £2,700,000
- Communal Ground Source Heat Pump solution for Gallowhill Multi Storey · Renfrewshire Council · £5,146,851
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.