gvtcx

Cobalt - Structural Surveying and Recommendations 2017-21

Symphony Housing Group Published 15 Feb 2017 Contracts Finder

key details

Value£90,000
Statusactive
Category (CPV) 71312000 +1 more
RegionNorth West
Deadline7 Mar 2017
Contract start4 Apr 2017
Contract end31 Jul 2021
Procedureopen
SME suitableYes
OCIDocds-b5fd17-2a6c0f05-ff7d-4867-b41f-526cdf9a63a8

description

Cobalt is looking to appoint a structural engineer/ consultant to proactively survey our housing stock. Requirements of a structural consultant are as follows:

PART 1 - Full Stock Condition Survey and structural recommendations (pre works - 600 units).

To proactively survey 10% of Cobalt's stock (600 units) over a 12 month period to include:

  • (A)Full structural survey including but not limited to roofs, walls, floors, windows & doors, chimneys, cellars, garages and outbuildings.

A detailed evaluation of the property condition and construction including the identification of property defects, their apparent cause, urgency of the repair required and future maintenance options.

All surveys will include a full building inspection and subsequent full survey report.

The reports should give specific advice on ? Wall tie failure

? Parapet gutter failure ? Damp and associated issues ? Evidence of woodworm or other infestations ? Damage to brickwork and roof ? Damage to timbers

? Large trees close to the property

The successful contractor should identify trends in structural issues based on property type, age and architype

  • (B)Full property stock condition survey to be completed (please see accompanying stock condition survey requirements Unit numbers for years 2-4 specified in the pricing document.

PART 2 - Structural inspections (during and post works - 30 units)

  • (A)To work pro-actively and provide advice to Cobalt's preferred structural repairs contractor to ensure a satisfactory solution is identified and delivered at those properties requiring the most urgent structural repairs.
  • (B)To post inspect all structural works once completed, ensuring all relevant standards are met and report back to the client in an agreed format.

PART 3 - Ad hoc structural advice

To provide advice to the client as required regarding structural problems. Based on an hourly or day rate.

Additional information: https://in-tendhost.co.uk/symphonyhousing/aspx/Tenders/Current

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
15 Feb 2017 Tender (tender) · 35d72a81-07eb-4274-8c38-2dcf4c86a27b-130605

more from Symphony Housing Group

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.