gvtcx

Supply and Delivery of Rasco Spare and Replacement Parts from Pelican Engineering

Department for Infrastructure Published 19 Apr 2018 Contracts Finder

key details

Value£115,000
Statuscomplete
Category (CPV) 34312000
RegionNorthern Ireland
Deadline31 Jan 2018
Contract start1 Feb 2018
Contract end23 Jan 2021
SME suitableYes
OCIDocds-b5fd17-2707bca6-98b1-49aa-a578-e0222418f2ce

Award

SupplierValueDateStatus
Pelican Engineering Co (Sales) Ltd £115,000 31 Jan 2018 active

description

DfI Roads provide winter service gritting actions on 107 designated routes. This is operated through a total winter service gritting fleet of 133 vehicles of which 26 are held as strategic spare vehicles. Currently 23 vehicles have gritting bodies manufactured by Rasco. Throughout the duration of the gritting bodies life components and hardware fail due to wear, damage or fatigue. Failed components and hardware must be replaced quickly to ensure that winter service gritting functions can be completed.

Direct Award Contract (DAC) is due to the fact that Rasco manufactured gritting spare and replacement parts can only be supplied directly from Pelican Engineering Ltd. Rasco is a Croatian company represented by Pelican Engineering Limited who has exclusive rights to body sales and spare/replacement parts sales within the UK and Ireland.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
19 Apr 2018 Award (award) · 9fd523f3-a72a-4aed-8fdd-8c13bba0d4c8-211917

more from Department for Infrastructure

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.