The Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)

London Borough of Sutton Published 28 May 2019 Contracts Finder

key details

Statuscomplete
Category (CPV) 45112711 +8 more
RegionLondon
Deadline18 Jun 2019
Contract start25 Jun 2019
Contract end30 Aug 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-1ef4138a-029f-41b8-85fd-17a97ad96f4a

Award

SupplierValueDateStatus
Initial Systems Limited £421,770 4 Jul 2019 active

description

The London Borough of Sutton, together with the South East Rivers Trust, is undertaking a 'Sutton SuDS in Schools' project. The Carshalton / Hackbridge area of the borough is in a Critical Drainage Area and to alleviate surface water flooding, the project will install SuDS features into seven local schools, to attenuate surface runoff.

The project aims are:

  1. Reduce flood risk to 27 properties in the downstream catchment.
  2. Eliminate or reduce on-site flooding in playgrounds in some of the schools in the project, as this flooding impacts learning and the school day.
  3. The SuDS features installed in the schools will bring educational or recreational benefits meaning school children will gain an understanding of what SuDS are and their importance.

The SuDs in Schools project is in four phases:

Phase 1 - initial scoping

Phase 2 - design

Phase 3 - construction of SuDS in three schools during the school

summer holidays July - August 2019

Phase 4 - design and construction of SuDS in four educational establishments during the school summer holidays July-August 2020

This commission is only for Phase 3 of the project. Phase 4 will be commissioned separately.

The SuDS tender was originally published in February 2019 however, London Borough of Sutton were unable to proceed as the bids were significantly over budget. The project team have since re-evaluated the works required and updated the specification accordingly. This re-published tender no longer requires the design input that was sought from contractors in the previous tender.

This project is grant funded by the Environment Agency and the budget for the works at each school is as follows:

Harris Junior Academy £90k Muschamp Primary School £90k Victor Seymor Primary School £108k

All bids submitted should therefore be in the region of the £288k budget.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
9 Jul 2019 Award (award) · 484765ca-cd9b-41b2-9f68-67f6847d7a0d-300164

more from London Borough of Sutton

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.