gvtcx

MEP Consultant to support Airport Departure Lounge Development at Jersey Airport, Channel Island

Ports of Jersey Published 23 Dec 2024 Contracts Finder

key details

Statuscomplete
Category (CPV) 71000000
Deadline27 Jan 2025
Contract start8 Mar 2025
Contract end31 Jan 2026
Procedureopen
SME suitableNo
OCIDocds-b5fd17-1afd0179-28e4-4e98-af15-0fc53e9f7865

Award

SupplierValueDateStatus
WSP UK Limited £0 17 Mar 2025 active

description

PoJ requires the services of an MEP Consultant to support the Jersey Airport Departures Lounge refurbishment based on the high level overview below:

⬢ Assist with the development of the pre-existing RIBA Stage 2 design, to RIBA Stage 4 coordinated information (part shell & core / part full fit out). Design to be progressed and produced in -line with the phased approach for construction of the works as outlined within the Scope of Requirements document.

⬢ Stage 2+ / 3 / 4 design information to accord with all current local / national regulations, including all relevant aviation regulations.

⬢ Identify opportunities and input into value engineering across RIBA Stages 3 & 4.

⬢ Ongoing support during workstages 5 & 6 i.e. to completion / handover.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
23 Dec 2024 Tender (tender) · 08422d6c-e2e3-4890-a241-792fee8c9c1b-813572
17 Apr 2025 Award (award) · 51024bb3-6f81-43db-a06b-20c86a91339b-841232

more from Ports of Jersey

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.