gvtcx

Long term effectiveness of AES funded bracken control

Defra Network eTendering Portal Published 7 Aug 2020 Contracts Finder

key details

Value£57,050
Statuscomplete
Category (CPV) 90700000
Deadline8 Sept 2020
Contract start12 Oct 2020
Contract end31 Mar 2021
Procedureopen
SME suitableYes
OCIDocds-b5fd17-19266ac7-37e5-4896-8cba-6242be1ebfe6

Award

SupplierValueDateStatus
Environment Systems Ltd £57,050 8 Oct 2020 active

description

Research to understand the role of follow up treatments, grazing and environmental factors in controlling the speed of bracken re-establishment after initial treatment. This is so that more accurate advice can be given to landowners and managers to; limit spread of bracken, preserve benefits of bracken control, and limit future need for chemical application. The project will draw on data collected from AES agreements, analysis of multispectral satellite imagery, and environmental data sources to establish the factors that govern the rate of re-establishment of bracken beds following bracken control. Inclusion of sites where control has not taken place will be required in order to provide a measure of the long term effectiveness of DEFRA funded bracken control and the response of bracken to changing climatic conditions. This project findings will inform multi-agency advice on bracken control and provide evidence to underpin future policy and environmental schemes. Objectives of the project are listed below.

  • 1.Identify a methodology for measuring the extent and vigour of bracken by remote sensing using satellite data.
  • 2.Analyse and determine the value of grazing data collected by land managers as a requirement of an AES; in order to gain a view on the effect of grazing on bracken re-establishment.
  • 3.Determine how the above information can be combined with other environmental data such as soil characteristics, elevation, aspect, region, and climate (particularly rainfall, latest frost dates and minimum, maximum and average temperatures) to provide a broad picture of the range of factors that influence bracken recovery.
  • 4.Identify the significance that varying grazing regimes play in controlling bracken re-expansion following bracken control across a wide range of English landscapes under a range of environmental conditions.
  • 5.Provide evidence that will:
  • a.Underpin advice given to landowners
  • b.Inform options for future
  • c.Demonstrate role of grazing

Additional information:

Please note that Defra procurement uses an E-tendering system for Procurement activities. This is currently provided by Bravo Solutions. To access appropriate tendering and contractual documents, please access the E-Tendering portal at https://defra.bravosolution.co.uk, ensuring that your registration includes "Defra". If you have any problems with this system, please contact Bravo on their telephone helpline number 0800 368 4850 or by emailing them at help@bravosolution.co.uk.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
13 Oct 2020 Award (award) · 631a3d8b-c6f3-4231-8b26-4f6398d959f2-386775

more from Defra Network eTendering Portal

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.